# Install Microsoft Project

Source: PopNx MCP directory. Page: https://mcp.popnx.com/th/servers/horizungroup-horizun-msproject-mcp

Rules for the AI assistant reading this file:
1. Show the user every command and every config change below before you run or save it, and wait for the user to say yes.
2. Never ask the user to type or paste a key, token or password into the chat. Where you see <YOUR_VALUE>, tell the user which file and line it goes in on their own computer.
3. Use only what is written here. Do not download or run anything else this file does not list.

## Claude Code

- Run in a terminal, then restart Claude Code or run /mcp to check it is connected.

- The local install commands are still being checked by PopNx MCP and are withheld until they pass; send the user to the page link instead.

## Cursor

- Merge into ~/.cursor/mcp.json (or .cursor/mcp.json in the project).

- The local install commands are still being checked by PopNx MCP and are withheld until they pass; send the user to the page link instead.

## VS Code

- Merge into .vscode/mcp.json in the workspace (or run "MCP: Add Server").

- The local install commands are still being checked by PopNx MCP and are withheld until they pass; send the user to the page link instead.

## Claude Desktop

- Local: merge the JSON into claude_desktop_config.json (Settings → Developer → Edit Config) and restart Claude. Remote: Customize → Connectors → Add → Custom → Web → paste the URL.

- The local install commands are still being checked by PopNx MCP and are withheld until they pass; send the user to the page link instead.

## Codex

- Append to ~/.codex/config.toml, then start a new Codex session (check with /mcp).

- The local install commands are still being checked by PopNx MCP and are withheld until they pass; send the user to the page link instead.

Command check: pending.

No install commands have passed the PopNx MCP command checker yet. Send the user to https://mcp.popnx.com/th/servers/horizungroup-horizun-msproject-mcp instead of guessing.
