プロトタイプ · プレビュー版:公式レジストリのすべてのサーバーを掲載し、30分ごとに同期しています。Google でログインするとレビューを書けます。プロトタイプ · 30分ごとに更新
PopNx MCPAIを使う人のためのMCPサーバー · やさしい言葉で解説 ログイン

Microsoft Project

作者:HorizunGroupバージョン 1.6.1i★ 9iパソコンで動くリポジトリ ↗
レジストリ名io.github.HorizunGroup/horizun-msproject-mcp

インストール方法

できること

Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.

作者による原文

  • 接続方法 パソコンで動く
  • アカウントまたはキー キー不要
  • カテゴリ 開発者ツール

一緒に使える

この種の作業を AI に教える Skill。これと一緒に使えます

rea

Reverse engineer anything with agents, from app behavior down to native binaries.

作者:morluto★ 468,7331 個の skill

Skill · 手順書

andrej-karpathy-skills

A single CLAUDE.md file to improve Claude Code behavior, derived from Andrej Karpathy's observations on LLM coding pitfalls.

作者:multica-ai★ 234,3321 個の skill

Skill · 手順書ライセンス記載なし

graphify

Turn any codebase, with its docs, SQL schemas, configs, and PDFs, into a queryable knowledge graph. A /graphify skill for Claude Code, Cursor, Codex, and Gemini CLI: local deterministic AST parsing, every edge explained, no vector store.

作者:Graphify-Labs★ 150,2871 個の skill

Skill · 手順書

この順位の理由

一覧は利用スコア(100 点満点)で並びます。内訳は次のとおり

人気12/80GitHub スターか週間ダウンロード数。大きい方を 60、小さい方を 20 で数えます
新しさ12/1230 日以内のリリースかコード更新で満点
応答中0/8前回の確認でクラウドのエンドポイントが応答
利用スコア24/100

品質: 基本チェック 3/3 項目に合格(表示のみ、並び順には不使用) · 勢い: データなし (「急上昇」タブでのみ使用)

インストール

使っているAIアプリを選んで、設定をコピーしてください。

チェック 3/3 合格 · あなたのパソコンで動きます

まず:どの AI を使っていますか?

使っているアプリを選ぶと、下に手順が表示されます。

Claude につなげますが、先に準備が必要です

キー不要、インストール不要 · パソコン版 Claude アプリ(Windows または Mac)のみ。Web やスマホでは使えません

  1. パソコン版 Claude アプリの設定ファイルを開く

    SettingsDeveloperEdit Config

  2. この設定を貼り付けて保存

    コマンドを確認中 · 確認が通るとコピーボタンが出ます

  3. Claude を終了してもう一度開く

  4. 試してみる

    Microsoft Project を使って、私に何ができるか教えて、1 つやってみせて

    ✓ Claude が Microsoft Project を使っていると言うか、回答に Microsoft Project のツール名が出れば接続成功です

メニュー名は 2026年11月11日 に Anthropic のヘルプページで確認 · アプリのバージョンにより画面が少し違うことがあります

ChatGPT はまだ Microsoft Project につなげません

Microsoft Project はパソコンに入れて使うものですが、ChatGPT は Web 上で動くサーバーにしかつなげません

代わりにできること

A · Microsoft Project につなげるアプリを使う

  • キー不要、インストール不要 · パソコン版 Claude アプリ(Windows または Mac)のみ。Web やスマホでは使えません
  • キー不要、インストール不要
  • キー不要、インストール不要
  • キー不要、インストール不要

B · 開発者ツール の中で ChatGPT につなげる別のサーバー

同じカテゴリでよく使われているものから、キーなしでアドレスだけでつなげるものを選びました

Claude Code につなげますが、先に準備が必要です

キー不要、インストール不要

  1. ターミナルを開く

    Mac:Command+スペースで Terminal と入力 · Windows:PowerShell を開く

  2. このコマンドを貼り付けて Enter

    コマンドを確認中 · 確認が通るとコピーボタンが出ます

  3. Claude Code で /mcp と入力

    Microsoft Project が一覧にあり、接続済みと表示されれば OK です

  4. 試してみる

    Microsoft Project を使って、私に何ができるか教えて、1 つやってみせて

    ✓ Claude Code が Microsoft Project を使っていると言うか、回答に Microsoft Project のツール名が出れば接続成功です

メニュー名は 2026年11月11日 に Anthropic のヘルプページで確認 · アプリのバージョンにより画面が少し違うことがあります

Cursor につなげますが、先に準備が必要です

キー不要、インストール不要

  1. このボタンで Cursor を開く

    コマンドを確認中 · 確認が通るとコピーボタンが出ます

  2. Cursor の AI チャットを Agent モードで開く

  3. 試してみる

    Microsoft Project を使って、私に何ができるか教えて、1 つやってみせて

    ✓ Cursor が Microsoft Project を使っていると言うか、回答に Microsoft Project のツール名が出れば接続成功です

メニュー名は 2026年11月11日 に Cursor のヘルプページで確認 · アプリのバージョンにより画面が少し違うことがあります

VS Code につなげますが、先に準備が必要です

キー不要、インストール不要

  1. このボタンで VS Code を開く

    コマンドを確認中 · 確認が通るとコピーボタンが出ます

  2. VS Code の AI チャットを Agent モードで開く

  3. 試してみる

    Microsoft Project を使って、私に何ができるか教えて、1 つやってみせて

    ✓ VS Code が Microsoft Project を使っていると言うか、回答に Microsoft Project のツール名が出れば接続成功です

メニュー名は 2026年11月11日 に VS Code のヘルプページで確認 · アプリのバージョンにより画面が少し違うことがあります

Windsurf、Zed、Gemini CLI など MCP を使える他のアプリは追加方法がそれぞれ違います。アプリ一覧で確認してください

MCP を使えるアプリをすべて見る →

JSON 設定は下の「開発者向け」にあります

つまずいたら?Microsoft Project を使っている人に聞いてみましょう💬 ディスカッション →
開発者向け:ターミナルのコマンドと JSON 設定

パソコンにインストール

Claude Code

コマンドを確認中 · 確認が通るとコピーボタンが出ます

Claude Desktop (claude_desktop_config.json)

コマンドを確認中 · 確認が通るとコピーボタンが出ます

Cursor (~/.cursor/mcp.json)

コマンドを確認中 · 確認が通るとコピーボタンが出ます

VS Code (mcp.json)

コマンドを確認中 · 確認が通るとコピーボタンが出ます

この設定は、作者のレジストリ登録情報から作成しています。READMEと違う場合は、READMEに従ってください。

ひと目でわかる

週あたりのダウンロードi
npm/PyPIにない
接続方法
パソコンで動く
最新バージョンi
1.6.1
レジストリ公開日i
2026年10月20日
コードの最終更新i
2026年11月17日
作者
HorizunGroup
パッケージ
nuget: HorizunMsProjectMcp
ウェブサイト
github.com
レジストリでの状態
有効

使えるアプリ

このサーバーのつなぎ方と、各アプリの公式ドキュメントに基づきます。2026年11月10日に確認。

パソコン上で動かせるアプリ

ClaudeGooseLM StudioMsty StudioCherry StudioCursorVS Code + GitHub CopilotVisual StudioWindsurf (Devin Desktop)ZedKiroClineContinueJetBrains AI AssistantClaude CodeCodex CLIGemini CLIOpenCodenodecodeWarpLibreChatRaycast

すべてのアプリと長所・短所 →

できること

パソコンで動くサーバーです。インストールすると、ツール一覧がAIアプリに表示されます。

基本チェックi

誰でも見られる情報をチェックしており、コードは読んでいません。当てはまらない項目は数に入れていません。 · 2026年11月20日にチェック

  • ✓ 合格

    作者とリポジトリが一致

    レジストリ名は、リポジトリを所有するGitHubアカウント HorizunGroup で確認済みです

  • ✓ 合格

    今もメンテナンスされている

    コードの最終更新:3 日前

  • ✓ 合格

    ライセンスがある

    MITを使用

  • – 対象外

    エンドポイントが応答する

    これはパソコンで動くため、インターネット上のエンドポイントはありません

  • – 対象外

    OAuthでサインイン

    パソコンで動き、代わりにローカルの設定を使います

  • … 未チェック

    ツールの説明に隠れた指示がない

    パソコンで動くサーバーです。ツール一覧を読み取れるのは、インターネット上のエンドポイントがある場合だけです

公開済みの脆弱性(OSV.dev)

未確認:バージョン付きの npm と PyPI パッケージのみ確認できます

確認していること → · JSON

作者の方へ:再確認の依頼・情報の誤りの報告
作者向け:README にバッジを付ける

作者の方は、このコードを README に貼れます。バッジはこのページにリンクします。

[![Featured on PopNx MCP](https://mcp.popnx.com/badge/horizungroup-horizun-msproject-mcp.svg)](https://mcp.popnx.com/en/servers/horizungroup-horizun-msproject-mcp)

話し合い

質問、コツの共有、使えないことの報告ができます。「役に立った」の多い順です。

まだ投稿はありません。最初の質問や共有をどうぞ。

ここの投稿は利用者によるもので、PopNx チームのものではありません。

ログインして投稿

ユーザーレビュー

まだレビューはありません

ログインしてレビューを書く

開発者ツールのほかのサーバーとの比較i

  • このカテゴリのほかの6202件のうち89%よりスターが多い
  • このカテゴリのほかの6202件のうち51%より最近レジストリに公開
  • 基本チェックの結果が、このカテゴリのほかの6202件のうち99%と同じかそれ以上

レジストリでこのカテゴリにある有効なすべてのサーバーと比較しています。スターは、公開者がリポジトリの所有者である場合だけ数えます。

よくある質問

Microsoft Projectは安全ですか?

当てはまる基本チェック3項目のうち3項目に合格しました。コードは読んでいません。キーやトークンを追加する前に、サーバーがどんなアクセスを求めているかを確認し、必要な権限だけを持つキーを使ってください。

どんなキーやコードが必要ですか?

レジストリには必須のキーは載っていません。ただし、最初に使うときにサインインを求めるサーバーもあります。

パソコンで動きますか、それともクラウドですか?

あなたのパソコンで動きます。必要なときにAIアプリが起動し、データは作者のサーバーを通りません(サーバー自体がオンラインサービスを呼び出す場合を除きます)。

今もメンテナンスされていますか?

GitHubリポジトリの最終更新は3 日前、最新バージョン(1.6.1)がレジストリに届いたのは31 日前です。

どのアプリで使えますか?

Claude Desktop、Claude Code、Cursor、VS CodeなどのMCP対応アプリで使えます。パソコンに.NETも必要です。

代わりに使えるものは?

同じカテゴリには:GitDiagram, Appllama, Cloudflare MCP, Omnara, Repowise

似た働きのほかの候補

同じカテゴリでほかの作者のもの。コマンドは確認済み。公式を先に、次にスター順。

カードの見方:↓ 週あたりのダウンロードi★ GitHubスターi3つの柱:レビュー · チェック · 利用状況i更新=最新バージョンをレジストリに公開した日i

GitDiagram

Architecture diagrams, explanations and Mermaid source for public GitHub repositories.

作者:ahmedkhaleel2004広く使われている★ 1.9万2 か月前更新

クラウドで動く✓ 提供元 · gitdiagram.comPopNx チームが実際に試用

Appllama

Study screens, flows and paywalls from top-earning iOS apps, then build from what wins.

作者:Appllama広く使われている★ 52333 か月前更新

クラウドで動く✓ 提供元 · appllama.io

Omnara

Deploy durable AI agents with Omnara, an open-source managed-agent platform.

作者:omnara-ai広く使われている★ 34232 か月前更新

クラウドで動く✓ 提供元 · omnara.com

Repowise

Codebase intelligence for AI coding agents: graph, git history, docs, decisions, code health.

作者:repowise-dev広く使われている↓ 6506/週★ 8177 リポジトリ全体のスター7 日前更新

パソコンでもクラウドでも✓ 提供元 · repowise.dev
似たものと比べる
これ
Microsoft Project
GitDiagramAppllamaCloudflare MCPOmnaraRepowise
動く場所パソコンにインストールが必要クラウドで動き、インストール不要クラウドで動き、インストール不要クラウドで動き、インストール不要クラウドで動き、インストール不要クラウドでもパソコンにインストールでも使える
キーが必要いいえいいえいいえいいえいいえいいえ
Claude で + から追加いいえいいえいいえはいいいえいいえ
基本チェック3/34/44/44/44/45/5
ライセンスMITMITMITApache-2.0Apache-2.0AGPL-3.0
料金登録情報に費用の記載なし登録情報に費用の記載なし登録情報に費用の記載なし登録情報に費用の記載なし登録情報に費用の記載なし登録情報に費用の記載なし

作者のREADME

READMEを開く

作者のリポジトリから書かれたとおりにコピーしたものです。PopNx MCPは内容を確認・推奨していません。HTML、画像、スクリプトは取り除いています。リンクはこのサイトの外へ移動します。

Horizun Project MCP

An MCP server for Microsoft Project that needs neither Java nor Microsoft Project — and tells you the truth about what it wrote.

It works as a PMO, not as a software operator. It does not just click through Microsoft Project on your behalf: it plans, controls and reports the way a project management office does, following PMBOK — a WBS that obeys the 100% rule, a cost-loaded baseline, earned value and earned schedule, quantitative schedule risk, formal change control with reasons and approvers, weekly look-ahead planning with PPC, and a period status report with its trend. Project is the engine; the method is the product.

*Español*

Point any MCP client at a .mpp, a Primavera .xer, or an MSPDI .xml and ask real questions: where the critical path runs, which resources are overbooked, whether the schedule would survive a DCMA audit, what a two-week slip actually does to the finish date. Then write changes back — and know which ones landed, because every one is re-read from the model before it is reported.

dotnet tool install -g HorizunMsProjectMcp

That is the whole install. No JVM. No Microsoft Project. No licence. It reads and schedules on its own.

Connect a client
ClientDo this
Claude DesktopDownload the .mcpb from Releases and drop it on Settings → Extensions. It installs the server itself — nothing to run first.
Claude Codeclaude mcp add horizun-msproject-mcp -- horizun-msproject-mcp
Codexcodex mcp add horizun-msproject-mcp -- horizun-msproject-mcp
ChatGPTNeeds an HTTPS bridge in front of the stdio server. How, and what to weigh first.

Full per-client instructions, including the plugin route and uninstall, are in docs/INSTALL.md.


Why this one

There are a handful of Microsoft Project MCP servers. Every one of them requires Java, or a licensed Microsoft Project install, or a paid JDBC driver — and on the machine this was built on, none of them would start. Eight things here are not available anywhere else:

Zero prerequisitesA single .NET binary. MPXJ is compiled to .NET through IKVM, so there is no JVM anywhere in the picture, and no Microsoft Project either.
Microsoft Project's dates, not an imitationWhere Project is installed, Project itself calculates every date this server reports. On seven real schedules — 8,823 tasks — recalculations and edits made through it matched Project on every task, to the minute. How.
Verified writesMicrosoft Project silently ignores writes all the time — auto-scheduled dates, hard constraints, summary rollups, calculated costs. Nothing here is reported as applied until it has been read back out of the model and matched.
DCMA 14-point assessmentThe industry standard for judging whether a schedule can be run on. The Primavera servers implement it; none of the Microsoft Project ones do. Check 12 genuinely injects a 600-day delay and measures what moves.
It recovers logic nobody linkedA schedule laid out correctly on the bar chart but never linked is the most common defect there is: DCMA flags it, nothing fixes it. The dates already state the order — this reads it back out, verifies the same order holds across every repetition, and proposes the missing links.
Reprogramming that is measuredRecovery options are applied to a copy of the schedule, rescheduled, and reported with the finish date they actually produce. An option that recovers nothing says so instead of being offered as advice.
It learns from your past projectsPoint it at finished schedules and it reports what each activity really took and what usually precedes it, then drafts a new programme from that — one task per unit, sequenced the way the trades actually followed each other.
A BIM bridgeTie schedule tasks to model elements by code, turn measured quantities into duration proposals, and emit the per-element dates that drive 4D in Navisworks and the progress dashboard in Power BI. Nobody else does this at all.

The 27 tools

Session — project_health · project_open · project_save

project_health is a doctor, not a ping. It detects Microsoft Project, tests whether its COM server *actually starts*, and when it does not, hands back the HRESULT diagnosis and the repair steps. That is not hypothetical: this machine hit CO_E_SERVER_EXEC_FAILURE with a perfectly valid registration, and step one of the repair path it emits is what fixed it.

Reading — project_info · tasks_query · links_query · resources_query · timephased_query

Filtered, paged, field-selectable. Tasks are addressed by their stable uid; the row id is display only, because it shifts the moment a task is inserted and addressing by it edits the wrong task.

Analysis — schedule_analyze · schedule_qa · baseline_compare

Computed server-side, so the agent asks a question instead of pulling two thousand tasks into context. Critical path, float distribution, driving path, day-by-day overallocation, DCMA-14, and full earned value (BCWS/BCWP/ACWP, SPI, CPI, EAC, TCPI) — denominated in cost where the schedule carries costs, in work hours where it carries hours, and weighted by duration where it carries neither, which is most of them. The report says which.

Writing — tasks_write · links_write · resources_write · calendars_write · schedule_update

Batched, typed, verified. Cycles are refused before they are applied, with the offending chain named. Calendars are edited in full: the working week and its hours (half or full Saturdays, shifts), working and non-working exceptions with their hours, the project calendar, and task and resource calendars. Tasks take their type, effort-driven flag, fixed cost, a baseline cost that leaves the baseline dates alone, and a whole outline in one batch; resources take rates, overtime rates, material units and max units Project actually sees. schedule_update op level_resources levels with Microsoft Project's own leveller, optionally within slack only. One thing is not offered: moving a task to another position in the outline. Asking for it gets a refusal that names it — an operation that half-works is worse than one that is absent.

Planning — schedule_recovery · schedule_scenarios · schedule_target · schedule_sequence · schedule_learn · schedule_generate

Reprogramming, measured rather than asserted. schedule_recovery finds what is late, ranks it by how much of the schedule sits behind it, then tries each recovery lever — removing lag on the driving chain, overlapping hand-offs once half the predecessor is done, compressing the longest critical tasks, working full Saturdays, and all of them together — on a throwaway copy and reports the finish date each one genuinely produces, and why any lever was dropped. schedule_scenarios compares alternatives you define — calendar, resource, task and logic changes together — side by side: finish, cost, overallocation, critical tasks, nothing committed. schedule_target tests a date you have been handed and names the work the network does not hold in place. schedule_sequence recovers the logic a schedule is missing by reading the order its own dates already state — the planner laid the work out correctly and never linked it, and that decision is recoverable. schedule_learn mines finished schedules for how long each activity actually takes and what usually comes before it; schedule_generate turns that into a first draft, one task per apartment or floor, sequenced the way the history says the trades follow each other.

Feed schedule_learn a model export alongside the schedules and it measures productivity — what a crew actually got through in a day — by joining quantities to tasks on the shared code. schedule_generate then sizes durations from the quantities of the new project rather than copying a remembered duration, because the rate is what carries between projects and the quantity is what changes. Give one export per schedule, in the same order: rates are measured per project, and quantities totalled across projects would inflate every one of them.

A draft can only be as well sequenced as the schedules it learned from. Where the sources link each activity to itself unit after unit but never to the trades around it, both tools say so and name the number: the library reports how many activities learned a predecessor other than themselves, and the draft reports how many trades it left with nothing scheduled before them.

Project control — schedule_risk, plus PMO aspects of the tools above

  • Quantitative schedule risk (schedule_risk): Monte Carlo over the network's own logic, all four link types and lags, with three-point ranges per task or a default spread, counted in working hours of the project calendar (half Saturdays and elapsed lags included) and anchored on the schedule's own finish, so the most-likely run is the schedule. P10/P50/P80/P90 finish, probability of a target and of the baseline, P80 contingency, risk drivers by criticality and sensitivity. Seeded runs repeat exactly.
  • Period status report (schedule_analyze aspect status_report): planned vs earned, SPI, CPI, earned-schedule SPI(t), EAC by three methods, TCPI, forecast finish, milestones at risk, top issues, and the trend of every recorded cut-off.
  • Cost-loaded schedule (schedule_update op load_budget): a budget by code, the same code BIM links on, spread over the tasks as cost; lines no task carries are reported. timephased_query measure s_curve returns cumulative PV, EV and AC, in money when costs are loaded.
  • Integrated change control: a rebaseline needs a reason (and takes approvedBy); every baseline, budget load and committed edit batch is logged with its finish impact (aspect change_log).
  • Short-interval planning (aspect lookahead): the next weeks' work with each task's constraints, ready vs constrained, and PPC against last week's recorded commitment (Last Planner).
  • WBS discipline: schedule_qa checks the 100% rule (empty summaries, cost or resources on summaries, duplicate WBS codes, single-child summaries); project_export format wbs_dictionary writes the WBS dictionary.

The history (cut-offs, commitments, changes) lives beside the schedule in .hzpmo.json, so it survives whichever tool writes the .mpp next.

Interop — project_export · project_import · bim_link · bim_sync

CSV, JSON, MSPDI, Primavera XER and PMXML, native .mpp, and a shaped Power BI dataset. Imports plan before they write.

What it costs to have loaded

The 27 tools present about 13,500 tokens of schema, in every prompt, for as long as the server is connected. That is the honest price of the surface and it is worth knowing before choosing to carry it. It is also why the surface stays near 25: the largest alternative ships 79 tools, and past a point an agent cannot hold the surface in its head well enough to choose correctly within it.


The two contracts

Nothing is applied until it is verified.

{

冒頭だけを表示しています。続きはリポジトリで読めます