Spree Commerce: open-source B2B and marketplace ecommerce
Open-source B2B and marketplace ecommerce; new stores include an MCP server for AI agents.
作者提供的说明(英文原文)
Change orders against quotes and work orders: line changes, approval, running contract value.
这三项永远不会合并成一个分数:意见、测量和人气是不同的东西。
我们还没有为它写通俗的介绍。下面是我们从注册中心读取到的事实。
选择你使用的 AI 应用,然后复制设置。
MCP_LICENSE_KEY标为机密的值是你账户的钥匙。千万不要分享给别人,也不要粘贴到聊天里。
你需要
你用的是哪个应用?
在上方选择你的应用。我们会记住它,下次按钮会显示“安装到 …”。
适用于网页版、桌面版和手机版 Claude:
https://mcp.zovo.one/mcp/change-order链接指向作者自己的文件;我们不托管也不重新打包它。打开文件后,Claude Desktop 会进行安装。
在终端中运行这条命令
claude mcp add --transport http change-order https://mcp.zovo.one/mcp/change-order运行前请先填写空着的值。
粘贴到项目中的 .cursor/mcp.json,或 ~/.cursor/mcp.json
{
"mcpServers": {
"change-order": {
"url": "https://mcp.zovo.one/mcp/change-order"
}
}
}浏览器会先询问是否打开应用,然后应用会显示设置并请你确认。密钥的值会留空,由你自己填写。
粘贴到项目中的 .vscode/mcp.json
{
"servers": {
"change-order": {
"type": "http",
"url": "https://mcp.zovo.one/mcp/change-order"
}
}
}浏览器会先询问是否打开应用,然后应用会显示设置并请你确认。密钥的值会留空,由你自己填写。
ChatGPT 只能连接互联网上的服务器:
https://mcp.zovo.one/mcp/change-order菜单名称可能因套餐和版本不同而略有差异。
你的选择通过 Cookie 保存在这台设备上,无需账户。
这些设置是根据作者在注册中心的条目生成的。如果 README 的写法不同,请以 README 为准。
工具名称和描述与服务器在 2026年11月6日 报告的完全一致。这些内容由作者撰写,不是我们写的;我们以纯文本形式显示。
change_order_createRaise a change order against a quote or work order and return its CO-YYYY-NNNN number: the reference, the client, a title, the date, and the original contract value in minor units. Free tier: 5 open.
change_order_add_lineAdd one line to a draft change order: added or removed with a quantity and a unit price in minor units, or changed with the old and the new quantity and price, each with a reason and a date. Free.
change_order_statusMove one change order along and stamp the date and note: draft to sent, sent to approved or rejected, either to void. Backwards steps, an unsent approval and a backdated move are all refused.
change_order_getReturn one change order in full by CO number or client: every added, removed and changed line with its reason and delta, VAT, delta gross, the status history and the running value. change_order_list finds the id.
change_order_listList change orders newest first with status, reference, client, currency and net delta, and above them the APPROVED and the pending delta per currency, kept apart. Filter by reference, status, client, date.
change_order_deleteDelete a DRAFT change order with no lines, freeing an open slot. One sent, approved, rejected or voided is refused, and so is one carrying lines: void it with change_order_status instead. The number is not reissued.
contract_valueThe running value of one quote or work order: original, approved deltas and current value, with pending draft and sent deltas kept apart. Net of VAT. A reference with no change order is refused.
change_order_documentRender one change order as a plain-text document for the client to approve: every line with its reason, the delta net and gross, the contract value before and after, and an approval block. The same text also comes back as a .txt download link valid for one hour. Pro.
change_order_invoice_payloadBuild the approved delta as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, with VAT at the shared profile rate. Writes nothing and creates nothing. Pro.
license_statusReport this endpoint's licence state for your token as JSON: the product, the tier free or pro, why it is not Pro, and the checkout URL. Call it to explain a free-tier refusal. No arguments, nothing changes.
license_activateTurn Pro on for this connection with key, an MCPL1. . issued at checkout for this server or the bundle. Data under your token stays; a wrong or expired key changes nothing. license_status confirms it.
我们检查的是任何人都能看到的信息;我们没有阅读代码。不适用的检查项不计入总数。 · 检查于 2026年11月8日
注册名称已通过 GitHub 账户 theluckystrike 验证,该账户拥有此仓库
我们还没有从 GitHub 读取这个仓库
我们还没有从 GitHub 读取这个仓库
在 65 毫秒内响应(HTTP 200)
无需登录
已读取 11 个工具描述,未发现针对 AI 的隐藏指令
与注册中心里这个分类中所有活跃的服务器比较。只有当发布者拥有该仓库时,星标数才计入。
它在 3 项适用的基础检查中通过了 3 项。我们没有阅读代码。在添加密钥或令牌之前,请先看看这个服务器要求哪些权限,并使用只具备所需权限的密钥。
你需要填写:MCP_LICENSE_KEY
两种方式都可以:安装在你的电脑上,或者连接云端版本。
GitHub 仓库最后更新于–,最新版本(0.23.0)于6天前进入注册中心。
支持 MCP 的应用,例如 Claude Desktop、Claude Code、Cursor 和 VS Code。它通过 URL 连接,所以接受远程 MCP 服务器的应用也可以使用,例如开启开发者模式的 ChatGPT。
同一分类中有:Spree Commerce: open-source B2B and marketplace ecommerce, Stripe MCP, MCP Cn Commerce
同一分类中其他作者的服务器,按星标数排序。
如何看卡片:↓ 每周下载量i★ GitHub 星标i三大支柱:评价 · 检查 · 使用情况i更新 = 最新版本发布到注册中心的时间i
Open-source B2B and marketplace ecommerce; new stores include an MCP server for AI agents.
MCP server integrating with Stripe - tools for customers, products, payments, and more.
8 read-only MCP platform entries; support is operation-specific; merchant live acceptance pending
按原文从作者的仓库复制。PopNx MCP 没有审查或背书其内容。HTML、图片和脚本已被移除。链接会离开本站。
In the [official MCP Registry](https://registry.modelcontextprotocol.io/v0.1/servers/io.github.theluckystrike%2Fchange-order/versions/latest) (io.github.theluckystrike/change-order). Change orders against a quote or a work order, kept the way a variation is kept on site: what was added, what was taken out and what changed, each with a reason and a date, sent to the client, and answered. The running contract value is the original plus the deltas the client has APPROVED; what they have not answered yet is shown as pending and never added in. Once a change order is approved, the delta comes back as invoice_create-ready items in MAJOR units and quote_create-ready items in MINOR units, in one call, with the scale printed against each.
No delta is stored. A change order holds its lines and its status history; the delta, the running value and the VAT are derived on every call, with the invoice server's own arithmetic. Nothing is invented: the first change order against a reference states the original contract value once, every later one inherits it, and a different figure is refused by name.
One-click (.mcpb): download change-order.mcpb from the latest release and double-click it in Claude Desktop: https://github.com/theluckystrike/mcp-servers/releases/latest
Hosted, no install: point a URL-based client at https://mcp.zovo.one/mcp/change-order. GET https://mcp.zovo.one/mcp/connect mints a token and prints a ready URL.
npm publish for @theluckystrike/mcp-change-order is pending, so the npx line below returns 404 today.
~/Library/Application Support/Claude/claude_desktop_config.json (macOS) or %APPDATA%\Claude\claude_desktop_config.json (Windows):
{
"mcpServers": { "change-order": { "command": "npx", "args": ["-y", "@theluckystrike/mcp-change-order"] } } }
claude mcp add change-order -- npx -y @theluckystrike/mcp-change-order
~/.cursor/mcp.json (global) or .cursor/mcp.json (project), same entry as Claude Desktop.
| Tool | What it does |
|---|---|
change_order_create | Raise a change order against a quote or work order: reference, client, title, date, and the original contract value on the first one |
change_order_add_line | Add an added, removed or changed line to a draft, with its quantity, unit price in minor units, reason and date |
change_order_status | Move it along: draft to sent, sent to approved or rejected, draft or sent to void, each step dated |
change_order_get | One change order in full: every line with its delta, the VAT, the history and the running value of the reference |
change_order_list | Change orders by reference, status, client and date range, with approved and pending deltas per currency |
change_order_delete | Delete an empty draft raised by mistake. Free on every tier |
contract_value | The running value of one reference: original, approved delta, current value, pending delta held apart |
change_order_document | The change order as a plain-text document for the client to approve |
change_order_invoice_payload | The approved delta as invoice_create items (MAJOR units) and quote_create items (MINOR units) |
license_status / license_activate | Free or Pro, and where to upgrade |
| Free | Pro | |
|---|---|---|
| Open change orders (draft and sent) | 5 | unlimited |
| Lines per change order | 200 | 200 |
| Raise, line, move, get, list, delete | yes | yes |
| Running contract value | yes | yes |
| Change order document | no | yes |
| Invoice-ready delta payload, both scales | no | yes |
The cap counts OPEN change orders, the ones the client has not answered, not the ones you have ever raised. Approving, rejecting or voiding one frees its slot, and so does change_order_delete on a draft with no lines; all of those are free on every tier, because a way back that only a Pro key can reach is not a way back.
Get Pro: https://mcp.zovo.one/buy/change-order (one-time $19, lifetime), or all servers for $39: https://mcp.zovo.one/buy/bundle
draft to sent; sent to approved or rejected; draft or sent to void. Approved, rejected and void are final. A draft cannot be approved directly: approval is the client's answer to something they were sent. Lines are added only while a change order is a draft; a sent one that needs another line is voided and raised again, so the client's approval always refers to what they were sent. Every step carries its own date, and a step dated before the last one is refused.
This server keeps no arithmetic of its own. computeTotals, currencyDecimals, formatMoney and roundHalfUp are imported from @theluckystrike/mcp-invoice/lib, the corrupt-store quarantine from @theluckystrike/mcp-timezone/lib, the timezone-aware "today" from @theluckystrike/mcp-quotes/lib. The VAT rate, the currency and the business name come from the shared business profile that business_set in the invoice server writes. Nothing is written outside this server's own directory, and no sibling store is opened.
A changed line is two items, not one, because one net item shows the customer nothing they can check. A line that goes from 3 x EUR 450.00 to 5 x EUR 420.00 is worth +EUR 750.00, and the tempting payload is one item of quantity 1 at EUR 750.00. The customer cannot reproduce that figure from anything on the change order they signed. The payload this server emits is a reversal, -3 x EUR 450.00, and the revised line, 5 x EUR 420.00; each reproduces on a calculator, and computeTotals over both is the same +EUR 750.00, because the invoice server's roundHalfUp is symmetric in sign. The same rule carries a removal as a negative quantity at the unit price it was booked at, which invoice_create accepts. The unit suite re-runs the invoice server's own computeTotals over the payload as returned and asserts the four item values and the three totals, then feeds the quote_create items into the same engine as though their MINOR figure were MAJOR and asserts the net is exactly 100x, so the day someone "simplifies" the payload to one net item, or moves a field between the two scales, the build says so instead of the customer.
All data stays on your machine, in ${XDG_DATA_HOME:-~/.local/share}/mcp-servers/change-order/. Nothing is sent anywhere. There is no account and no API key. License keys are verified offline. This server reads one file it does not own, the shared business profile, and writes into no store but its own.
Built by theluckystrike. https://github.com/theluckystrike
Any MCP client (Claude, Cursor, Windsurf, VS Code) can read this repository's documentation directly via GitMCP - no install: