原型 · 预览版:收录官方注册中心里的全部服务器,每 30 分钟同步一次。使用 Google 登录即可撰写评价。原型 · 每 30 分钟更新
PopNx MCP为使用 AI 的人准备的 MCP 服务器 · 用大白话讲清楚 登录

Microsoft Project

作者:HorizunGroup版本 1.6.1i★ 9i在你的电脑上运行代码仓库 ↗
注册名称io.github.HorizunGroup/horizun-msproject-mcp

安装方法

能做什么

Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.

作者提供的原文

  • 连接方式 在你的电脑上运行
  • 账号或密钥 无需密钥
  • 分类 开发者工具

可搭配使用

教 AI 做这类工作的 Skill,可与本项一起使用

rea

Reverse engineer anything with agents, from app behavior down to native binaries.

作者:morluto★ 468,7331 个 skill

Skill · 操作手册

andrej-karpathy-skills

A single CLAUDE.md file to improve Claude Code behavior, derived from Andrej Karpathy's observations on LLM coding pitfalls.

作者:multica-ai★ 234,3321 个 skill

Skill · 操作手册未注明许可证

graphify

Turn any codebase, with its docs, SQL schemas, configs, and PDFs, into a queryable knowledge graph. A /graphify skill for Claude Code, Cursor, Codex, and Gemini CLI: local deterministic AST parsing, every edge explained, no vector store.

作者:Graphify-Labs★ 150,2871 个 skill

Skill · 操作手册

为什么排在这里

列表按使用分(满分 100)排序,由以下部分组成

热度12/80GitHub 星标或每周下载量:较大的计 60,较小的计 20
新鲜度12/1230 天内有发布或代码更新得满分
仍在响应0/8上次检查时云端端点有响应
使用分24/100

质量: 基础检查通过 3/3 项(仅展示,不用于排序) · 上升势头: 暂无数据 (只用于“上升中”标签)

安装

选择你使用的 AI 应用,然后复制设置。

用一句话让 AI 帮你安装

请帮我安装 Microsoft Project。按照 https://mcp.popnx.com/i/horizungroup-horizun-msproject-mcp.md 操作,先把命令给我看,等我同意后再运行。

粘贴到能在你电脑上工作的 AI(如 Claude Code、Cursor)。它会读取我们的步骤,先给你看命令,等你同意。无需密钥,无需注册。 · 查看 AI 会读取的全文

通过 3/3 项检查 · 在你的电脑上运行 · ✓ 命令已检查 2026年11月20日

第一步:你用哪个 AI?

选择你用的应用,步骤会显示在下方。

可连接 Claude,但需要先准备

不需要密钥,不用安装程序 · 仅限电脑上的 Claude 应用(Windows 或 Mac),网页和手机不可用

让 AI 帮你安装

把这段话复制到 Claude 的对话里。AI 会先检查电脑,告诉你要改哪个文件,并且每次都等你同意。

请在这台电脑上为 Claude 安装 MCP server Microsoft Project,按顺序:1) 2) 只使用这份配置(已通过 PopNx MCP 检查):{ "mcpServers": { "horizun-msproject": { "command": "dnx", "args": [ "HorizunMsProjectMcp", "--yes" ] } } } 3) 告诉我要修改的文件完整路径或要运行的命令,等我同意。4) 不需要密钥。5) 按约定执行,然后确认 Microsoft Project 的工具真的出现了。

这段话不包含你的密钥。如果需要密钥,AI 会请你自己粘贴到文件或应用的输入框里。

  1. 打开电脑版 Claude 应用的设置文件

    SettingsDeveloperEdit Config

  2. 粘贴这些设置并保存文件

    {
      "mcpServers": {
        "horizun-msproject": {
          "command": "dnx",
          "args": [
            "HorizunMsProjectMcp",
            "--yes"
          ]
        }
      }
    }
  3. 退出 Claude 再重新打开

  4. 试一试

    用 Microsoft Project 告诉我你能帮我做什么,然后做一件给我看

    ✓ 如果 Claude 说正在使用 Microsoft Project,或回答中出现 Microsoft Project 的工具名称,就表示连接成功

菜单名称已于 2026年11月11日 对照 Anthropic 帮助页面核实 · 你的界面可能因版本略有不同

ChatGPT 暂时无法连接 Microsoft Project

Microsoft Project 需要安装在你的电脑上,而 ChatGPT 只能连接在网上运行的服务器

你可以改用这些方式

A · 使用能连接 Microsoft Project 的应用

  • 不需要密钥,不用安装程序 · 仅限电脑上的 Claude 应用(Windows 或 Mac),网页和手机不可用
  • 不需要密钥,不用安装程序
  • 不需要密钥,不用安装程序
  • 不需要密钥,不用安装程序

B · 开发者工具 类中能连接 ChatGPT 的其他服务器

从同类中使用较多的里挑选,仅限用地址即可连接、无需密钥的

可连接 Claude Code,但需要先准备

不需要密钥,不用安装程序

让 AI 帮你安装

把这段话复制到 Claude Code 的对话里。AI 会先检查电脑,告诉你要改哪个文件,并且每次都等你同意。

请在这台电脑上为 Claude Code 安装 MCP server Microsoft Project,按顺序:1) 2) 只使用这份配置(已通过 PopNx MCP 检查):claude mcp add --scope user horizun-msproject -- dnx HorizunMsProjectMcp --yes 3) 告诉我要修改的文件完整路径或要运行的命令,等我同意。4) 不需要密钥。5) 按约定执行,然后确认 Microsoft Project 的工具真的出现了。

这段话不包含你的密钥。如果需要密钥,AI 会请你自己粘贴到文件或应用的输入框里。

  1. 打开终端

    Mac:按 Command+空格,输入 Terminal · Windows:打开 PowerShell

  2. 粘贴这条命令并按 Enter

    claude mcp add --scope user horizun-msproject -- dnx HorizunMsProjectMcp --yes
  3. 在 Claude Code 中输入 /mcp

    应能看到 Microsoft Project 在列表中并显示已连接

  4. 试一试

    用 Microsoft Project 告诉我你能帮我做什么,然后做一件给我看

    ✓ 如果 Claude Code 说正在使用 Microsoft Project,或回答中出现 Microsoft Project 的工具名称,就表示连接成功

菜单名称已于 2026年11月11日 对照 Anthropic 帮助页面核实 · 你的界面可能因版本略有不同

可连接 Cursor,但需要先准备

不需要密钥,不用安装程序

让 AI 帮你安装

把这段话复制到 Cursor 的对话里。AI 会先检查电脑,告诉你要改哪个文件,并且每次都等你同意。

请在这台电脑上为 Cursor 安装 MCP server Microsoft Project,按顺序:1) 2) 只使用这份配置(已通过 PopNx MCP 检查):{ "mcpServers": { "horizun-msproject": { "command": "dnx", "args": [ "HorizunMsProjectMcp", "--yes" ] } } } 3) 告诉我要修改的文件完整路径或要运行的命令,等我同意。4) 不需要密钥。5) 按约定执行,然后确认 Microsoft Project 的工具真的出现了。

这段话不包含你的密钥。如果需要密钥,AI 会请你自己粘贴到文件或应用的输入框里。

  1. 点击这个按钮打开 Cursor

    在 Cursor 中打开

    Cursor 会请你确认安装,点击 Install

  2. 在 Cursor 中以 Agent 模式打开 AI 聊天

  3. 试一试

    用 Microsoft Project 告诉我你能帮我做什么,然后做一件给我看

    ✓ 如果 Cursor 说正在使用 Microsoft Project,或回答中出现 Microsoft Project 的工具名称,就表示连接成功

菜单名称已于 2026年11月11日 对照 Cursor 帮助页面核实 · 你的界面可能因版本略有不同

可连接 VS Code,但需要先准备

不需要密钥,不用安装程序

让 AI 帮你安装

把这段话复制到 VS Code 的对话里。AI 会先检查电脑,告诉你要改哪个文件,并且每次都等你同意。

请在这台电脑上为 VS Code 安装 MCP server Microsoft Project,按顺序:1) 2) 只使用这份配置(已通过 PopNx MCP 检查):{ "servers": { "horizun-msproject": { "type": "stdio", "command": "dnx", "args": [ "HorizunMsProjectMcp", "--yes" ] } } } 3) 告诉我要修改的文件完整路径或要运行的命令,等我同意。4) 不需要密钥。5) 按约定执行,然后确认 Microsoft Project 的工具真的出现了。

这段话不包含你的密钥。如果需要密钥,AI 会请你自己粘贴到文件或应用的输入框里。

  1. 点击这个按钮打开 VS Code

    在 VS Code 中打开

    VS Code 会请你确认安装,点击 Install

  2. 在 VS Code 中以 Agent 模式打开 AI 聊天

  3. 试一试

    用 Microsoft Project 告诉我你能帮我做什么,然后做一件给我看

    ✓ 如果 VS Code 说正在使用 Microsoft Project,或回答中出现 Microsoft Project 的工具名称,就表示连接成功

菜单名称已于 2026年11月11日 对照 VS Code 帮助页面核实 · 你的界面可能因版本略有不同

其他支持 MCP 的应用(如 Windsurf、Zed、Gemini CLI)添加方式各不相同,请在应用列表中查看

查看所有支持 MCP 的应用 →

JSON 设置在下方“开发者专用”中

卡住了?问问正在用 Microsoft Project 的人💬 讨论 →
开发者专用:终端命令和 JSON 设置

安装在电脑上

Claude Code

claude mcp add --scope user horizun-msproject -- dnx HorizunMsProjectMcp --yes

Claude Desktop (claude_desktop_config.json)

{
  "mcpServers": {
    "horizun-msproject": {
      "command": "dnx",
      "args": [
        "HorizunMsProjectMcp",
        "--yes"
      ]
    }
  }
}

Cursor (~/.cursor/mcp.json)

{
  "mcpServers": {
    "horizun-msproject": {
      "command": "dnx",
      "args": [
        "HorizunMsProjectMcp",
        "--yes"
      ]
    }
  }
}

VS Code (mcp.json)

{
  "servers": {
    "horizun-msproject": {
      "type": "stdio",
      "command": "dnx",
      "args": [
        "HorizunMsProjectMcp",
        "--yes"
      ]
    }
  }
}

这些设置是根据作者在注册中心的条目生成的。如果 README 的写法不同,请以 README 为准。

一览

每周下载量i
不在 npm/PyPI 上
连接方式
在你的电脑上运行
最新版本i
1.6.1
发布到注册中心i
2026年10月20日
代码最后更新i
2026年11月17日
作者
HorizunGroup
软件包
nuget: HorizunMsProjectMcp
注册状态
活跃

哪些应用可以使用它

依据这个服务器的连接方式和各应用自己的文档,检查于 2026年11月10日。

在你的电脑上运行,适用于

ClaudeGooseLM StudioMsty StudioCherry StudioCursorVS Code + GitHub CopilotVisual StudioWindsurf (Devin Desktop)ZedKiroClineContinueJetBrains AI AssistantClaude CodeCodex CLIGemini CLIOpenCodenodecodeWarpLibreChatRaycast

全部应用及其优缺点 →

它能做什么

它在你的电脑上运行;安装后,工具列表会显示在你的 AI 应用中。

基础检查i

我们检查的是任何人都能看到的信息;我们没有阅读代码。不适用的检查项不计入总数。 · 检查于 2026年11月20日

  • ✓ 通过

    作者与仓库一致

    注册名称已通过 GitHub 账户 HorizunGroup 验证,该账户拥有此仓库

  • ✓ 通过

    仍在维护

    代码最后更新于3天前

  • ✓ 通过

    有许可证

    使用 MIT

  • – 不适用

    端点有响应

    它在你的电脑上运行,没有互联网端点

  • – 不适用

    使用 OAuth 登录

    在你的电脑上运行,改用本地设置

  • … 尚未检查

    工具描述中没有隐藏指令

    它在你的电脑上运行;我们只能读取互联网端点的工具列表

已公开的漏洞(OSV.dev)

未检查:只能检查标明版本的 npm 和 PyPI 包

我们检查什么 → · JSON

作者:申请重新检查或报告信息错误
给作者:在 README 中加徽章

如果你是作者,可把这段代码贴到 README。徽章会链接回本页。

[![Featured on PopNx MCP](https://mcp.popnx.com/badge/horizungroup-horizun-msproject-mcp.svg)](https://mcp.popnx.com/en/servers/horizungroup-horizun-msproject-mcp)

讨论

提问、分享技巧或报告无法使用。按“有帮助”数量排序。

还没有帖子,欢迎第一个提问或分享。

此处内容由用户撰写,不代表 PopNx 团队。

登录后发帖

用户评价

还没有评价

登录后写评价

与“开发者工具”中的其他服务器比较i

  • 星标数多于此分类中其他 6209 个服务器的 89%
  • 发布到注册中心的时间比此分类中其他 6209 个服务器的 50% 更新
  • 基础检查结果等于或优于此分类中其他 6209 个服务器的 99%

与注册中心里这个分类中所有活跃的服务器比较。只有当发布者拥有该仓库时,星标数才计入。

常见问题

Microsoft Project 安全吗?

它在 3 项适用的基础检查中通过了 3 项。我们没有阅读代码。在添加密钥或令牌之前,请先看看这个服务器要求哪些权限,并使用只具备所需权限的密钥。

它需要哪些密钥或代码?

注册中心没有列出必需的密钥,不过有些服务器会在首次使用时要求你登录。

它在我的电脑上运行还是在云端?

它在你的电脑上运行。你的 AI 应用会在需要时启动它,数据不会经过作者的服务器(除非它自己调用在线服务)。

它还在维护吗?

GitHub 仓库最后更新于3天前,最新版本(1.6.1)于31天前进入注册中心。

哪些应用可以使用它?

支持 MCP 的应用,例如 Claude Desktop、Claude Code、Cursor 和 VS Code。你的电脑上还需要有 .NET。

有什么可以替代它?

同一分类中有:GitDiagram, Appllama, Cloudflare MCP, Omnara, Repowise

功能相近的其他选择

同一分类、其他作者、命令已通过检查。官方的排在前面,再按星标排序。

如何看卡片:↓ 每周下载量i★ GitHub 星标i三大支柱:评价 · 检查 · 使用情况i更新 = 最新版本发布到注册中心的时间i

GitDiagram

Architecture diagrams, explanations and Mermaid source for public GitHub repositories.

作者:ahmedkhaleel2004广泛使用★ 1.9万2个月前更新

在云端运行✓ 服务方 · gitdiagram.comPopNx 团队已实际试用

Appllama

Study screens, flows and paywalls from top-earning iOS apps, then build from what wins.

作者:Appllama广泛使用★ 52333个月前更新

在云端运行✓ 服务方 · appllama.io

Omnara

Deploy durable AI agents with Omnara, an open-source managed-agent platform.

作者:omnara-ai广泛使用★ 34232个月前更新

在云端运行✓ 服务方 · omnara.com

Repowise

Codebase intelligence for AI coding agents: graph, git history, docs, decisions, code health.

作者:repowise-dev广泛使用↓ 6506/周★ 8177 整个仓库的星标7天前更新

电脑或云端✓ 服务方 · repowise.dev
与相似项目对比
本项
Microsoft Project
GitDiagramAppllamaCloudflare MCPOmnaraRepowise
运行位置需要安装在电脑上在云端运行,无需安装在云端运行,无需安装在云端运行,无需安装在云端运行,无需安装云端或安装在电脑上都可以
需要密钥否否否否否否
可在 Claude 中按 + 添加否否否是否否
基础检查3/34/44/44/44/45/5
许可证MITMITMITApache-2.0Apache-2.0AGPL-3.0
价格登记中未列出费用登记中未列出费用登记中未列出费用登记中未列出费用登记中未列出费用登记中未列出费用

作者的 README

打开 README

按原文从作者的仓库复制。PopNx MCP 没有审查或背书其内容。HTML、图片和脚本已被移除。链接会离开本站。

Horizun Project MCP

An MCP server for Microsoft Project that needs neither Java nor Microsoft Project — and tells you the truth about what it wrote.

It works as a PMO, not as a software operator. It does not just click through Microsoft Project on your behalf: it plans, controls and reports the way a project management office does, following PMBOK — a WBS that obeys the 100% rule, a cost-loaded baseline, earned value and earned schedule, quantitative schedule risk, formal change control with reasons and approvers, weekly look-ahead planning with PPC, and a period status report with its trend. Project is the engine; the method is the product.

*Español*

Point any MCP client at a .mpp, a Primavera .xer, or an MSPDI .xml and ask real questions: where the critical path runs, which resources are overbooked, whether the schedule would survive a DCMA audit, what a two-week slip actually does to the finish date. Then write changes back — and know which ones landed, because every one is re-read from the model before it is reported.

dotnet tool install -g HorizunMsProjectMcp

That is the whole install. No JVM. No Microsoft Project. No licence. It reads and schedules on its own.

Connect a client
ClientDo this
Claude DesktopDownload the .mcpb from Releases and drop it on Settings → Extensions. It installs the server itself — nothing to run first.
Claude Codeclaude mcp add horizun-msproject-mcp -- horizun-msproject-mcp
Codexcodex mcp add horizun-msproject-mcp -- horizun-msproject-mcp
ChatGPTNeeds an HTTPS bridge in front of the stdio server. How, and what to weigh first.

Full per-client instructions, including the plugin route and uninstall, are in docs/INSTALL.md.


Why this one

There are a handful of Microsoft Project MCP servers. Every one of them requires Java, or a licensed Microsoft Project install, or a paid JDBC driver — and on the machine this was built on, none of them would start. Eight things here are not available anywhere else:

Zero prerequisitesA single .NET binary. MPXJ is compiled to .NET through IKVM, so there is no JVM anywhere in the picture, and no Microsoft Project either.
Microsoft Project's dates, not an imitationWhere Project is installed, Project itself calculates every date this server reports. On seven real schedules — 8,823 tasks — recalculations and edits made through it matched Project on every task, to the minute. How.
Verified writesMicrosoft Project silently ignores writes all the time — auto-scheduled dates, hard constraints, summary rollups, calculated costs. Nothing here is reported as applied until it has been read back out of the model and matched.
DCMA 14-point assessmentThe industry standard for judging whether a schedule can be run on. The Primavera servers implement it; none of the Microsoft Project ones do. Check 12 genuinely injects a 600-day delay and measures what moves.
It recovers logic nobody linkedA schedule laid out correctly on the bar chart but never linked is the most common defect there is: DCMA flags it, nothing fixes it. The dates already state the order — this reads it back out, verifies the same order holds across every repetition, and proposes the missing links.
Reprogramming that is measuredRecovery options are applied to a copy of the schedule, rescheduled, and reported with the finish date they actually produce. An option that recovers nothing says so instead of being offered as advice.
It learns from your past projectsPoint it at finished schedules and it reports what each activity really took and what usually precedes it, then drafts a new programme from that — one task per unit, sequenced the way the trades actually followed each other.
A BIM bridgeTie schedule tasks to model elements by code, turn measured quantities into duration proposals, and emit the per-element dates that drive 4D in Navisworks and the progress dashboard in Power BI. Nobody else does this at all.

The 27 tools

Session — project_health · project_open · project_save

project_health is a doctor, not a ping. It detects Microsoft Project, tests whether its COM server *actually starts*, and when it does not, hands back the HRESULT diagnosis and the repair steps. That is not hypothetical: this machine hit CO_E_SERVER_EXEC_FAILURE with a perfectly valid registration, and step one of the repair path it emits is what fixed it.

Reading — project_info · tasks_query · links_query · resources_query · timephased_query

Filtered, paged, field-selectable. Tasks are addressed by their stable uid; the row id is display only, because it shifts the moment a task is inserted and addressing by it edits the wrong task.

Analysis — schedule_analyze · schedule_qa · baseline_compare

Computed server-side, so the agent asks a question instead of pulling two thousand tasks into context. Critical path, float distribution, driving path, day-by-day overallocation, DCMA-14, and full earned value (BCWS/BCWP/ACWP, SPI, CPI, EAC, TCPI) — denominated in cost where the schedule carries costs, in work hours where it carries hours, and weighted by duration where it carries neither, which is most of them. The report says which.

Writing — tasks_write · links_write · resources_write · calendars_write · schedule_update

Batched, typed, verified. Cycles are refused before they are applied, with the offending chain named. Calendars are edited in full: the working week and its hours (half or full Saturdays, shifts), working and non-working exceptions with their hours, the project calendar, and task and resource calendars. Tasks take their type, effort-driven flag, fixed cost, a baseline cost that leaves the baseline dates alone, and a whole outline in one batch; resources take rates, overtime rates, material units and max units Project actually sees. schedule_update op level_resources levels with Microsoft Project's own leveller, optionally within slack only. One thing is not offered: moving a task to another position in the outline. Asking for it gets a refusal that names it — an operation that half-works is worse than one that is absent.

Planning — schedule_recovery · schedule_scenarios · schedule_target · schedule_sequence · schedule_learn · schedule_generate

Reprogramming, measured rather than asserted. schedule_recovery finds what is late, ranks it by how much of the schedule sits behind it, then tries each recovery lever — removing lag on the driving chain, overlapping hand-offs once half the predecessor is done, compressing the longest critical tasks, working full Saturdays, and all of them together — on a throwaway copy and reports the finish date each one genuinely produces, and why any lever was dropped. schedule_scenarios compares alternatives you define — calendar, resource, task and logic changes together — side by side: finish, cost, overallocation, critical tasks, nothing committed. schedule_target tests a date you have been handed and names the work the network does not hold in place. schedule_sequence recovers the logic a schedule is missing by reading the order its own dates already state — the planner laid the work out correctly and never linked it, and that decision is recoverable. schedule_learn mines finished schedules for how long each activity actually takes and what usually comes before it; schedule_generate turns that into a first draft, one task per apartment or floor, sequenced the way the history says the trades follow each other.

Feed schedule_learn a model export alongside the schedules and it measures productivity — what a crew actually got through in a day — by joining quantities to tasks on the shared code. schedule_generate then sizes durations from the quantities of the new project rather than copying a remembered duration, because the rate is what carries between projects and the quantity is what changes. Give one export per schedule, in the same order: rates are measured per project, and quantities totalled across projects would inflate every one of them.

A draft can only be as well sequenced as the schedules it learned from. Where the sources link each activity to itself unit after unit but never to the trades around it, both tools say so and name the number: the library reports how many activities learned a predecessor other than themselves, and the draft reports how many trades it left with nothing scheduled before them.

Project control — schedule_risk, plus PMO aspects of the tools above

  • Quantitative schedule risk (schedule_risk): Monte Carlo over the network's own logic, all four link types and lags, with three-point ranges per task or a default spread, counted in working hours of the project calendar (half Saturdays and elapsed lags included) and anchored on the schedule's own finish, so the most-likely run is the schedule. P10/P50/P80/P90 finish, probability of a target and of the baseline, P80 contingency, risk drivers by criticality and sensitivity. Seeded runs repeat exactly.
  • Period status report (schedule_analyze aspect status_report): planned vs earned, SPI, CPI, earned-schedule SPI(t), EAC by three methods, TCPI, forecast finish, milestones at risk, top issues, and the trend of every recorded cut-off.
  • Cost-loaded schedule (schedule_update op load_budget): a budget by code, the same code BIM links on, spread over the tasks as cost; lines no task carries are reported. timephased_query measure s_curve returns cumulative PV, EV and AC, in money when costs are loaded.
  • Integrated change control: a rebaseline needs a reason (and takes approvedBy); every baseline, budget load and committed edit batch is logged with its finish impact (aspect change_log).
  • Short-interval planning (aspect lookahead): the next weeks' work with each task's constraints, ready vs constrained, and PPC against last week's recorded commitment (Last Planner).
  • WBS discipline: schedule_qa checks the 100% rule (empty summaries, cost or resources on summaries, duplicate WBS codes, single-child summaries); project_export format wbs_dictionary writes the WBS dictionary.

The history (cut-offs, commitments, changes) lives beside the schedule in .hzpmo.json, so it survives whichever tool writes the .mpp next.

Interop — project_export · project_import · bim_link · bim_sync

CSV, JSON, MSPDI, Primavera XER and PMXML, native .mpp, and a shaped Power BI dataset. Imports plan before they write.

What it costs to have loaded

The 27 tools present about 13,500 tokens of schema, in every prompt, for as long as the server is connected. That is the honest price of the surface and it is worth knowing before choosing to carry it. It is also why the surface stays near 25: the largest alternative ships 79 tools, and past a point an agent cannot hold the surface in its head well enough to choose correctly within it.


The two contracts

Nothing is applied until it is verified.

{

只显示了开头部分;其余内容请在仓库中阅读