Prototype · Preview: every server in the official registry, synced every 30 minutes. Sign in with Google to write reviews.Prototype · updated every 30 min
PopNx MCPMCP servers for people who use AI · explained in plain words Sign in

Microsoft Project

by HorizunGroupversion 1.6.1i★ 9iRuns on your computerRepository ↗
Registry nameio.github.HorizunGroup/horizun-msproject-mcp

How to install

What it does

Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.

  • Connects Runs on your computer
  • Account or key No key needed
  • Category Developer tools

Use together with

Skills that teach the AI this kind of work; they work alongside this one

rea

Reverse engineer anything with agents, from app behavior down to native binaries.

by morluto★ 468,7331 skills

Skill · How-to guide

andrej-karpathy-skills

A single CLAUDE.md file to improve Claude Code behavior, derived from Andrej Karpathy's observations on LLM coding pitfalls.

by multica-ai★ 234,3321 skills

Skill · How-to guideNo license stated

graphify

Turn any codebase, with its docs, SQL schemas, configs, and PDFs, into a queryable knowledge graph. A /graphify skill for Claude Code, Cursor, Codex, and Gemini CLI: local deterministic AST parsing, every edge explained, no vector store.

by Graphify-Labs★ 150,2871 skills

Skill · How-to guide

Why it ranks here

Lists are ordered by a usage score (out of 100) built from these parts

Popularity12/80GitHub stars or weekly downloads: the larger counts 60, the smaller 20
Freshness12/12Full marks for a release or code change within 30 days
Still answering0/8The cloud endpoint answered at the last check
Usage score24/100

Quality: Passed 3/3 basic checks (shown, not used for ordering) · Momentum: No data yet (Used only on the Trending tab)

Install

Pick the AI app you use, then copy the settings.

Let your AI install it with one sentence

Please install Microsoft Project. Follow https://mcp.popnx.com/i/horizungroup-horizun-msproject-mcp.md, show me the commands and wait for my OK before running them.

Paste it into an AI that can work on your computer (such as Claude Code or Cursor). It reads our steps, shows you the commands and waits for your OK. No key, no sign-up. · See the full text your AI reads

Passed 3/3 checks · Runs on your computer · ✓ Commands checked Nov 20, 2026

First: which AI do you use?

Pick your app and the steps appear below.

Works with Claude, with some setup first

No key, nothing to install · Only the Claude desktop app (Windows or Mac), not the web or phone

Let AI install it

Copy this message into a Claude chat. The AI checks your computer, tells you which file it will change, and waits for your OK every time.

Please install the MCP server Microsoft Project for Claude on this computer, in this order: 1) 2) Use only this config (already checked by PopNx MCP): { "mcpServers": { "horizun-msproject": { "command": "dnx", "args": [ "HorizunMsProjectMcp", "--yes" ] } } } 3) Tell me the full path of the file you will change, or the command you will run, and wait for my OK. 4) No key is needed. 5) Do what we agreed, then check that the Microsoft Project tools really show up.

This message has no key in it. If a key is needed, the AI will ask you to paste it yourself into the file or the app’s field.

  1. Open the Claude desktop app’s settings file

    SettingsDeveloperEdit Config

  2. Paste these settings and save the file

    {
      "mcpServers": {
        "horizun-msproject": {
          "command": "dnx",
          "args": [
            "HorizunMsProjectMcp",
            "--yes"
          ]
        }
      }
    }
  3. Quit Claude and open it again

  4. Try it

    Use Microsoft Project and tell me what you can do for me, then show me one thing

    ✓ If Claude says it is using Microsoft Project or shows a Microsoft Project tool in the answer, you are connected

Menu names checked against Anthropic’s help page on Nov 11, 2026 · your screen may differ slightly by app version

ChatGPT cannot connect Microsoft Project yet

Microsoft Project runs on your computer, but ChatGPT can only connect servers that run on the web

What you can do instead

A · Use an app that can connect Microsoft Project

  • No key, nothing to install · Only the Claude desktop app (Windows or Mac), not the web or phone
  • No key, nothing to install
  • No key, nothing to install
  • No key, nothing to install

B · Others in Developer tools that work with ChatGPT

Picked from the most used in the same category, only ones that connect by address with no key

Works with Claude Code, with some setup first

No key, nothing to install

Let AI install it

Copy this message into a Claude Code chat. The AI checks your computer, tells you which file it will change, and waits for your OK every time.

Please install the MCP server Microsoft Project for Claude Code on this computer, in this order: 1) 2) Use only this config (already checked by PopNx MCP): claude mcp add --scope user horizun-msproject -- dnx HorizunMsProjectMcp --yes 3) Tell me the full path of the file you will change, or the command you will run, and wait for my OK. 4) No key is needed. 5) Do what we agreed, then check that the Microsoft Project tools really show up.

This message has no key in it. If a key is needed, the AI will ask you to paste it yourself into the file or the app’s field.

  1. Open Terminal

    Mac: press Command+Space and type Terminal · Windows: open PowerShell

  2. Paste this command and press Enter

    claude mcp add --scope user horizun-msproject -- dnx HorizunMsProjectMcp --yes
  3. Type /mcp in Claude Code

    You should see Microsoft Project listed as connected

  4. Try it

    Use Microsoft Project and tell me what you can do for me, then show me one thing

    ✓ If Claude Code says it is using Microsoft Project or shows a Microsoft Project tool in the answer, you are connected

Menu names checked against Anthropic’s help page on Nov 11, 2026 · your screen may differ slightly by app version

Works with Cursor, with some setup first

No key, nothing to install

Let AI install it

Copy this message into a Cursor chat. The AI checks your computer, tells you which file it will change, and waits for your OK every time.

Please install the MCP server Microsoft Project for Cursor on this computer, in this order: 1) 2) Use only this config (already checked by PopNx MCP): { "mcpServers": { "horizun-msproject": { "command": "dnx", "args": [ "HorizunMsProjectMcp", "--yes" ] } } } 3) Tell me the full path of the file you will change, or the command you will run, and wait for my OK. 4) No key is needed. 5) Do what we agreed, then check that the Microsoft Project tools really show up.

This message has no key in it. If a key is needed, the AI will ask you to paste it yourself into the file or the app’s field.

  1. Click this button to open Cursor

    Open in Cursor

    Cursor asks you to confirm; click Install

  2. Open the AI chat in Cursor in Agent mode

  3. Try it

    Use Microsoft Project and tell me what you can do for me, then show me one thing

    ✓ If Cursor says it is using Microsoft Project or shows a Microsoft Project tool in the answer, you are connected

Menu names checked against Cursor’s help page on Nov 11, 2026 · your screen may differ slightly by app version

Works with VS Code, with some setup first

No key, nothing to install

Let AI install it

Copy this message into a VS Code chat. The AI checks your computer, tells you which file it will change, and waits for your OK every time.

Please install the MCP server Microsoft Project for VS Code on this computer, in this order: 1) 2) Use only this config (already checked by PopNx MCP): { "servers": { "horizun-msproject": { "type": "stdio", "command": "dnx", "args": [ "HorizunMsProjectMcp", "--yes" ] } } } 3) Tell me the full path of the file you will change, or the command you will run, and wait for my OK. 4) No key is needed. 5) Do what we agreed, then check that the Microsoft Project tools really show up.

This message has no key in it. If a key is needed, the AI will ask you to paste it yourself into the file or the app’s field.

  1. Click this button to open VS Code

    Open in VS Code

    VS Code asks you to confirm; click Install

  2. Open the AI chat in VS Code in Agent mode

  3. Try it

    Use Microsoft Project and tell me what you can do for me, then show me one thing

    ✓ If VS Code says it is using Microsoft Project or shows a Microsoft Project tool in the answer, you are connected

Menu names checked against VS Code’s help page on Nov 11, 2026 · your screen may differ slightly by app version

Other apps that use MCP, such as Windsurf, Zed or Gemini CLI, each add servers differently. See how in the app list.

See every app that uses MCP →

JSON settings are under “For developers” below

Stuck? Ask people who use Microsoft Project💬 Discussion →
For developers: Terminal commands and JSON settings

Installed on your computer

Claude Code

claude mcp add --scope user horizun-msproject -- dnx HorizunMsProjectMcp --yes

Claude Desktop (claude_desktop_config.json)

{
  "mcpServers": {
    "horizun-msproject": {
      "command": "dnx",
      "args": [
        "HorizunMsProjectMcp",
        "--yes"
      ]
    }
  }
}

Cursor (~/.cursor/mcp.json)

{
  "mcpServers": {
    "horizun-msproject": {
      "command": "dnx",
      "args": [
        "HorizunMsProjectMcp",
        "--yes"
      ]
    }
  }
}

VS Code (mcp.json)

{
  "servers": {
    "horizun-msproject": {
      "type": "stdio",
      "command": "dnx",
      "args": [
        "HorizunMsProjectMcp",
        "--yes"
      ]
    }
  }
}

These settings are generated from the maker’s registry entry. If the README says otherwise, follow the README.

At a glance

Downloads per weeki
Not on npm/PyPI
Connection
Runs on your computer
Latest versioni
1.6.1
Published to registryi
Oct 20, 2026
Code last changedi
Nov 17, 2026
Maker
HorizunGroup
Packages
nuget: HorizunMsProjectMcp
Website
github.com
Registry status
Active

Which apps can use it

Based on how this server connects and on each app’s own docs, checked Nov 10, 2026.

Run on your computer in

ClaudeGooseLM StudioMsty StudioCherry StudioCursorVS Code + GitHub CopilotVisual StudioWindsurf (Devin Desktop)ZedKiroClineContinueJetBrains AI AssistantClaude CodeCodex CLIGemini CLIOpenCodenodecodeWarpLibreChatRaycast

All apps, with pros and cons →

Related guides

What it can do

Runs on your computer; the tool list appears in your AI app after you install it.

Basic checksi

We check information anyone can see; we have not read the code. Checks that do not apply are left out of the count. · Checked Nov 20, 2026

  • ✓ Pass

    Maker matches the repo

    The registry name was verified with the GitHub account HorizunGroup, which owns the repo

  • ✓ Pass

    Still maintained

    Code last changed 3 days ago

  • ✓ Pass

    Has a licence

    Uses MIT

  • – Not applicable

    Endpoint responds

    This one runs on your computer; there is no internet endpoint

  • – Not applicable

    Sign-in with OAuth

    Runs on your computer and uses local settings instead

  • … Not checked yet

    No hidden instructions in tool descriptions

    Runs on your computer; we can only read tool lists from internet endpoints

Published vulnerabilities (OSV.dev)

Not checked: only npm and PyPI packages with a version can be checked

What we check → · JSON

Makers: ask for a re-check or report wrong info
For makers: add a badge to your README

If you made this, paste this code into your README. The badge links back to this page.

[![Featured on PopNx MCP](https://mcp.popnx.com/badge/horizungroup-horizun-msproject-mcp.svg)](https://mcp.popnx.com/en/servers/horizungroup-horizun-msproject-mcp)

Discussion

Ask, share a tip or report that it does not work. Sorted by what people marked helpful.

No posts yet. Be the first to ask or share.

Posts here are written by users, not the PopNx team.

Sign in to post

User reviews

No reviews yet

Sign in to write a review

Compared with others in Developer toolsi

  • More stars than 89% of the other 6209 servers in this category
  • Published to the registry more recently than 50% of the other 6209 servers in this category
  • Basic checks equal to or better than 99% of the other 6209 servers in this category

Compared with every active server in this category in the registry. Stars count only when the publisher owns the repo.

Common questions

Is Microsoft Project safe?

It passed 3 of 3 applicable basic checks. We have not read the code. Before adding a key or token, see what access the server asks for and use a key with only the permissions you need.

What keys or codes does it need?

The registry does not list a required key, though some servers ask you to sign in on first use.

Does it run on my computer or in the cloud?

It runs on your computer. Your AI app starts it when needed, and data does not pass through the maker’s servers (unless it calls an online service itself).

Is it still maintained?

The GitHub repo last changed 3 days ago, and the latest version (1.6.1) reached the registry 31 days ago.

Which apps can use it?

Apps that support MCP, such as Claude Desktop, Claude Code, Cursor and VS Code. You also need .NET on your computer.

What can I use instead?

In the same category: GitDiagram, Appllama, Cloudflare MCP, Omnara, Repowise

Similar alternatives

Same category, other makers, commands already checked. Official ones first, then by stars.

Reading a card:↓ Downloads per weeki★ GitHub starsiThree pillars: reviews · checks · usageiUpdated = latest version published to the registryi

GitDiagram

Architecture diagrams, explanations and Mermaid source for public GitHub repositories.

by ahmedkhaleel2004Widely used★ 19KUpdated 2 months ago

Runs in the cloud✓ service owner · gitdiagram.comTried by the PopNx team

Appllama

Study screens, flows and paywalls from top-earning iOS apps, then build from what wins.

by AppllamaWidely used★ 5.2KUpdated 3 months ago

Runs in the cloud✓ service owner · appllama.io

Repowise

Codebase intelligence for AI coding agents: graph, git history, docs, decisions, code health.

by repowise-devWidely used↓ 6.5K/wk★ 8.2K Stars for the whole repoUpdated 7 days ago

Computer or cloud✓ service owner · repowise.dev
Compared with similar ones
This one
Microsoft Project
GitDiagramAppllamaCloudflare MCPOmnaraRepowise
Runs whereInstalls on your computerRuns in the cloud, nothing to installRuns in the cloud, nothing to installRuns in the cloud, nothing to installRuns in the cloud, nothing to installCloud or install on your computer
Needs a keyNoNoNoNoNoNo
Add with + in ClaudeNoNoNoYesNoNo
Basic checks3/34/44/44/44/45/5
LicenseMITMITMITApache-2.0Apache-2.0AGPL-3.0
PriceNo cost listed in the registryNo cost listed in the registryNo cost listed in the registryNo cost listed in the registryNo cost listed in the registryNo cost listed in the registry

README from the maker

Open the README

Copied from the maker’s repo as written. PopNx MCP has not reviewed or endorsed it. HTML, images and scripts are removed. Links lead off this site.

Horizun Project MCP

An MCP server for Microsoft Project that needs neither Java nor Microsoft Project — and tells you the truth about what it wrote.

It works as a PMO, not as a software operator. It does not just click through Microsoft Project on your behalf: it plans, controls and reports the way a project management office does, following PMBOK — a WBS that obeys the 100% rule, a cost-loaded baseline, earned value and earned schedule, quantitative schedule risk, formal change control with reasons and approvers, weekly look-ahead planning with PPC, and a period status report with its trend. Project is the engine; the method is the product.

*Español*

Point any MCP client at a .mpp, a Primavera .xer, or an MSPDI .xml and ask real questions: where the critical path runs, which resources are overbooked, whether the schedule would survive a DCMA audit, what a two-week slip actually does to the finish date. Then write changes back — and know which ones landed, because every one is re-read from the model before it is reported.

dotnet tool install -g HorizunMsProjectMcp

That is the whole install. No JVM. No Microsoft Project. No licence. It reads and schedules on its own.

Connect a client
ClientDo this
Claude DesktopDownload the .mcpb from Releases and drop it on Settings → Extensions. It installs the server itself — nothing to run first.
Claude Codeclaude mcp add horizun-msproject-mcp -- horizun-msproject-mcp
Codexcodex mcp add horizun-msproject-mcp -- horizun-msproject-mcp
ChatGPTNeeds an HTTPS bridge in front of the stdio server. How, and what to weigh first.

Full per-client instructions, including the plugin route and uninstall, are in docs/INSTALL.md.


Why this one

There are a handful of Microsoft Project MCP servers. Every one of them requires Java, or a licensed Microsoft Project install, or a paid JDBC driver — and on the machine this was built on, none of them would start. Eight things here are not available anywhere else:

Zero prerequisitesA single .NET binary. MPXJ is compiled to .NET through IKVM, so there is no JVM anywhere in the picture, and no Microsoft Project either.
Microsoft Project's dates, not an imitationWhere Project is installed, Project itself calculates every date this server reports. On seven real schedules — 8,823 tasks — recalculations and edits made through it matched Project on every task, to the minute. How.
Verified writesMicrosoft Project silently ignores writes all the time — auto-scheduled dates, hard constraints, summary rollups, calculated costs. Nothing here is reported as applied until it has been read back out of the model and matched.
DCMA 14-point assessmentThe industry standard for judging whether a schedule can be run on. The Primavera servers implement it; none of the Microsoft Project ones do. Check 12 genuinely injects a 600-day delay and measures what moves.
It recovers logic nobody linkedA schedule laid out correctly on the bar chart but never linked is the most common defect there is: DCMA flags it, nothing fixes it. The dates already state the order — this reads it back out, verifies the same order holds across every repetition, and proposes the missing links.
Reprogramming that is measuredRecovery options are applied to a copy of the schedule, rescheduled, and reported with the finish date they actually produce. An option that recovers nothing says so instead of being offered as advice.
It learns from your past projectsPoint it at finished schedules and it reports what each activity really took and what usually precedes it, then drafts a new programme from that — one task per unit, sequenced the way the trades actually followed each other.
A BIM bridgeTie schedule tasks to model elements by code, turn measured quantities into duration proposals, and emit the per-element dates that drive 4D in Navisworks and the progress dashboard in Power BI. Nobody else does this at all.

The 27 tools

Session — project_health · project_open · project_save

project_health is a doctor, not a ping. It detects Microsoft Project, tests whether its COM server *actually starts*, and when it does not, hands back the HRESULT diagnosis and the repair steps. That is not hypothetical: this machine hit CO_E_SERVER_EXEC_FAILURE with a perfectly valid registration, and step one of the repair path it emits is what fixed it.

Reading — project_info · tasks_query · links_query · resources_query · timephased_query

Filtered, paged, field-selectable. Tasks are addressed by their stable uid; the row id is display only, because it shifts the moment a task is inserted and addressing by it edits the wrong task.

Analysis — schedule_analyze · schedule_qa · baseline_compare

Computed server-side, so the agent asks a question instead of pulling two thousand tasks into context. Critical path, float distribution, driving path, day-by-day overallocation, DCMA-14, and full earned value (BCWS/BCWP/ACWP, SPI, CPI, EAC, TCPI) — denominated in cost where the schedule carries costs, in work hours where it carries hours, and weighted by duration where it carries neither, which is most of them. The report says which.

Writing — tasks_write · links_write · resources_write · calendars_write · schedule_update

Batched, typed, verified. Cycles are refused before they are applied, with the offending chain named. Calendars are edited in full: the working week and its hours (half or full Saturdays, shifts), working and non-working exceptions with their hours, the project calendar, and task and resource calendars. Tasks take their type, effort-driven flag, fixed cost, a baseline cost that leaves the baseline dates alone, and a whole outline in one batch; resources take rates, overtime rates, material units and max units Project actually sees. schedule_update op level_resources levels with Microsoft Project's own leveller, optionally within slack only. One thing is not offered: moving a task to another position in the outline. Asking for it gets a refusal that names it — an operation that half-works is worse than one that is absent.

Planning — schedule_recovery · schedule_scenarios · schedule_target · schedule_sequence · schedule_learn · schedule_generate

Reprogramming, measured rather than asserted. schedule_recovery finds what is late, ranks it by how much of the schedule sits behind it, then tries each recovery lever — removing lag on the driving chain, overlapping hand-offs once half the predecessor is done, compressing the longest critical tasks, working full Saturdays, and all of them together — on a throwaway copy and reports the finish date each one genuinely produces, and why any lever was dropped. schedule_scenarios compares alternatives you define — calendar, resource, task and logic changes together — side by side: finish, cost, overallocation, critical tasks, nothing committed. schedule_target tests a date you have been handed and names the work the network does not hold in place. schedule_sequence recovers the logic a schedule is missing by reading the order its own dates already state — the planner laid the work out correctly and never linked it, and that decision is recoverable. schedule_learn mines finished schedules for how long each activity actually takes and what usually comes before it; schedule_generate turns that into a first draft, one task per apartment or floor, sequenced the way the history says the trades follow each other.

Feed schedule_learn a model export alongside the schedules and it measures productivity — what a crew actually got through in a day — by joining quantities to tasks on the shared code. schedule_generate then sizes durations from the quantities of the new project rather than copying a remembered duration, because the rate is what carries between projects and the quantity is what changes. Give one export per schedule, in the same order: rates are measured per project, and quantities totalled across projects would inflate every one of them.

A draft can only be as well sequenced as the schedules it learned from. Where the sources link each activity to itself unit after unit but never to the trades around it, both tools say so and name the number: the library reports how many activities learned a predecessor other than themselves, and the draft reports how many trades it left with nothing scheduled before them.

Project control — schedule_risk, plus PMO aspects of the tools above

  • Quantitative schedule risk (schedule_risk): Monte Carlo over the network's own logic, all four link types and lags, with three-point ranges per task or a default spread, counted in working hours of the project calendar (half Saturdays and elapsed lags included) and anchored on the schedule's own finish, so the most-likely run is the schedule. P10/P50/P80/P90 finish, probability of a target and of the baseline, P80 contingency, risk drivers by criticality and sensitivity. Seeded runs repeat exactly.
  • Period status report (schedule_analyze aspect status_report): planned vs earned, SPI, CPI, earned-schedule SPI(t), EAC by three methods, TCPI, forecast finish, milestones at risk, top issues, and the trend of every recorded cut-off.
  • Cost-loaded schedule (schedule_update op load_budget): a budget by code, the same code BIM links on, spread over the tasks as cost; lines no task carries are reported. timephased_query measure s_curve returns cumulative PV, EV and AC, in money when costs are loaded.
  • Integrated change control: a rebaseline needs a reason (and takes approvedBy); every baseline, budget load and committed edit batch is logged with its finish impact (aspect change_log).
  • Short-interval planning (aspect lookahead): the next weeks' work with each task's constraints, ready vs constrained, and PPC against last week's recorded commitment (Last Planner).
  • WBS discipline: schedule_qa checks the 100% rule (empty summaries, cost or resources on summaries, duplicate WBS codes, single-child summaries); project_export format wbs_dictionary writes the WBS dictionary.

The history (cut-offs, commitments, changes) lives beside the schedule in .hzpmo.json, so it survives whichever tool writes the .mpp next.

Interop — project_export · project_import · bim_link · bim_sync

CSV, JSON, MSPDI, Primavera XER and PMXML, native .mpp, and a shaped Power BI dataset. Imports plan before they write.

What it costs to have loaded

The 27 tools present about 13,500 tokens of schema, in every prompt, for as long as the server is connected. That is the honest price of the surface and it is worth knowing before choosing to carry it. It is also why the surface stays near 25: the largest alternative ships 79 tools, and past a point an agent cannot hold the surface in its head well enough to choose correctly within it.


The two contracts

Nothing is applied until it is verified.

{

Only the beginning is shown; read the rest in the repo