What it does
Audit, reschedule and author Microsoft Project schedules. No Java, no Project install.
- Connects 내 컴퓨터에서 실행
- Account or key No key needed
- Category 개발자 도구
함께 쓰기
이런 작업을 AI에게 가르치는 Skill, 이것과 함께 쓸 수 있습니다
andrej-karpathy-skills
A single CLAUDE.md file to improve Claude Code behavior, derived from Andrej Karpathy's observations on LLM coding pitfalls.
graphify
Turn any codebase, with its docs, SQL schemas, configs, and PDFs, into a queryable knowledge graph. A /graphify skill for Claude Code, Cursor, Codex, and Gemini CLI: local deterministic AST parsing, every edge explained, no vector store.
이 순위인 이유
목록은 사용 점수(100점 만점)로 정렬되며 구성은 다음과 같습니다
| 인기 | 12/80 | GitHub 별 또는 주간 다운로드: 큰 쪽 60, 작은 쪽 20 |
|---|---|---|
| 최신성 | 12/12 | 30일 안에 릴리스나 코드 변경이 있으면 만점 |
| 응답 중 | 0/8 | 마지막 점검 때 클라우드 엔드포인트가 응답 |
| 사용 점수 | 24/100 |
품질: 기본 점검 3/3개 통과(표시만, 정렬에는 안 씀) · 상승세: 데이터 없음 (급상승 탭에서만 사용)
설치
쓰고 있는 AI 앱을 고른 다음 설정을 복사하세요.
한 문장으로 AI에게 설치 맡기기
Microsoft Project 설치해 줘. https://mcp.popnx.com/i/horizungroup-horizun-msproject-mcp.md 를 따라 하고, 명령을 먼저 보여 주고 내가 승인하면 실행해.내 컴퓨터에서 작업하는 AI(Claude Code, Cursor 등)에 붙여 넣으세요. 단계를 읽고 명령을 보여 준 뒤 승인을 기다립니다. 키도 가입도 필요 없습니다. · AI가 읽을 전체 내용 보기
검사 3/3 통과 · 내 컴퓨터에서 실행돼요 · ✓ 명령 확인 2026년 11월 13일
먼저: 어떤 AI를 쓰시나요?
쓰는 앱을 고르면 아래에 단계가 나옵니다.
Claude에 연결할 수 있지만 먼저 준비가 필요해요
키 필요 없음, 설치 필요 없음 · 컴퓨터용 Claude 앱(Windows 또는 Mac)에서만 되고 웹이나 모바일은 안 돼요
AI에게 설치 맡기기
이 메시지를 Claude 채팅에 붙여 넣으세요. AI가 컴퓨터를 확인하고 어떤 파일을 바꿀지 알려 준 뒤 매번 동의를 기다립니다.
이 컴퓨터의 Claude에 MCP server Microsoft Project을 설치해 주세요. 순서대로: 1) 2) 이 설정만 사용하세요(PopNx MCP 확인 완료): { "mcpServers": { "horizun-msproject": { "command": "dnx", "args": [ "HorizunMsProjectMcp", "--yes" ] } } } 3) 바꿀 파일의 전체 경로나 실행할 명령을 알려 주고 제 동의를 기다리세요. 4) 키는 필요 없습니다. 5) 합의한 대로 실행한 뒤 Microsoft Project의 도구가 실제로 보이는지 확인하세요.이 메시지에는 키가 없습니다. 키가 필요하면 AI가 파일이나 앱 입력란에 직접 붙여 넣으라고 안내합니다.
컴퓨터용 Claude 앱 설정 파일 열기
SettingsDeveloperEdit Config
이 설정을 붙여 넣고 저장
{ "mcpServers": { "horizun-msproject": { "command": "dnx", "args": [ "HorizunMsProjectMcp", "--yes" ] } } }Claude를 끄고 다시 열기
해 보기
Microsoft Project을 써서 나에게 무엇을 해 줄 수 있는지 알려 주고, 하나 해 봐✓ Claude가 Microsoft Project을 쓰고 있다고 하거나 답에 Microsoft Project 도구 이름이 나오면 연결된 거예요
메뉴 이름은 2026년 11월 11일에 Anthropic 도움말에서 확인 · 앱 버전에 따라 화면이 조금 다를 수 있어요
ChatGPT는 아직 Microsoft Project에 연결할 수 없어요
Microsoft Project는 내 컴퓨터에 설치해서 쓰지만 ChatGPT는 웹에서 도는 서버만 연결할 수 있어요
대신 이렇게 할 수 있어요
A · Microsoft Project에 연결되는 앱 쓰기
- 키 필요 없음, 설치 필요 없음 · 컴퓨터용 Claude 앱(Windows 또는 Mac)에서만 되고 웹이나 모바일은 안 돼요
- 키 필요 없음, 설치 필요 없음
- 키 필요 없음, 설치 필요 없음
- 키 필요 없음, 설치 필요 없음
B · 개발자 도구에서 ChatGPT에 연결되는 다른 서버
같은 분류에서 많이 쓰는 것 중 키 없이 주소만으로 연결되는 것을 골랐어요
- Sentry✓ ChatGPT
- Compiler Explorer✓ ChatGPT
- GitDiagram✓ ChatGPT
Claude Code에 연결할 수 있지만 먼저 준비가 필요해요
키 필요 없음, 설치 필요 없음
AI에게 설치 맡기기
이 메시지를 Claude Code 채팅에 붙여 넣으세요. AI가 컴퓨터를 확인하고 어떤 파일을 바꿀지 알려 준 뒤 매번 동의를 기다립니다.
이 컴퓨터의 Claude Code에 MCP server Microsoft Project을 설치해 주세요. 순서대로: 1) 2) 이 설정만 사용하세요(PopNx MCP 확인 완료): claude mcp add --scope user horizun-msproject -- dnx HorizunMsProjectMcp --yes 3) 바꿀 파일의 전체 경로나 실행할 명령을 알려 주고 제 동의를 기다리세요. 4) 키는 필요 없습니다. 5) 합의한 대로 실행한 뒤 Microsoft Project의 도구가 실제로 보이는지 확인하세요.이 메시지에는 키가 없습니다. 키가 필요하면 AI가 파일이나 앱 입력란에 직접 붙여 넣으라고 안내합니다.
터미널 열기
Mac: Command+스페이스를 누르고 Terminal 입력 · Windows: PowerShell 열기
이 명령을 붙여 넣고 Enter
claude mcp add --scope user horizun-msproject -- dnx HorizunMsProjectMcp --yesClaude Code에서 /mcp 입력
Microsoft Project이 목록에 있고 연결됨으로 보이면 돼요
해 보기
Microsoft Project을 써서 나에게 무엇을 해 줄 수 있는지 알려 주고, 하나 해 봐✓ Claude Code가 Microsoft Project을 쓰고 있다고 하거나 답에 Microsoft Project 도구 이름이 나오면 연결된 거예요
메뉴 이름은 2026년 11월 11일에 Anthropic 도움말에서 확인 · 앱 버전에 따라 화면이 조금 다를 수 있어요
Cursor에 연결할 수 있지만 먼저 준비가 필요해요
키 필요 없음, 설치 필요 없음
AI에게 설치 맡기기
이 메시지를 Cursor 채팅에 붙여 넣으세요. AI가 컴퓨터를 확인하고 어떤 파일을 바꿀지 알려 준 뒤 매번 동의를 기다립니다.
이 컴퓨터의 Cursor에 MCP server Microsoft Project을 설치해 주세요. 순서대로: 1) 2) 이 설정만 사용하세요(PopNx MCP 확인 완료): { "mcpServers": { "horizun-msproject": { "command": "dnx", "args": [ "HorizunMsProjectMcp", "--yes" ] } } } 3) 바꿀 파일의 전체 경로나 실행할 명령을 알려 주고 제 동의를 기다리세요. 4) 키는 필요 없습니다. 5) 합의한 대로 실행한 뒤 Microsoft Project의 도구가 실제로 보이는지 확인하세요.이 메시지에는 키가 없습니다. 키가 필요하면 AI가 파일이나 앱 입력란에 직접 붙여 넣으라고 안내합니다.
Cursor에서 AI 채팅을 Agent 모드로 열기
해 보기
Microsoft Project을 써서 나에게 무엇을 해 줄 수 있는지 알려 주고, 하나 해 봐✓ Cursor가 Microsoft Project을 쓰고 있다고 하거나 답에 Microsoft Project 도구 이름이 나오면 연결된 거예요
메뉴 이름은 2026년 11월 11일에 Cursor 도움말에서 확인 · 앱 버전에 따라 화면이 조금 다를 수 있어요
VS Code에 연결할 수 있지만 먼저 준비가 필요해요
키 필요 없음, 설치 필요 없음
AI에게 설치 맡기기
이 메시지를 VS Code 채팅에 붙여 넣으세요. AI가 컴퓨터를 확인하고 어떤 파일을 바꿀지 알려 준 뒤 매번 동의를 기다립니다.
이 컴퓨터의 VS Code에 MCP server Microsoft Project을 설치해 주세요. 순서대로: 1) 2) 이 설정만 사용하세요(PopNx MCP 확인 완료): { "servers": { "horizun-msproject": { "type": "stdio", "command": "dnx", "args": [ "HorizunMsProjectMcp", "--yes" ] } } } 3) 바꿀 파일의 전체 경로나 실행할 명령을 알려 주고 제 동의를 기다리세요. 4) 키는 필요 없습니다. 5) 합의한 대로 실행한 뒤 Microsoft Project의 도구가 실제로 보이는지 확인하세요.이 메시지에는 키가 없습니다. 키가 필요하면 AI가 파일이나 앱 입력란에 직접 붙여 넣으라고 안내합니다.
VS Code에서 AI 채팅을 Agent 모드로 열기
해 보기
Microsoft Project을 써서 나에게 무엇을 해 줄 수 있는지 알려 주고, 하나 해 봐✓ VS Code가 Microsoft Project을 쓰고 있다고 하거나 답에 Microsoft Project 도구 이름이 나오면 연결된 거예요
메뉴 이름은 2026년 11월 11일에 VS Code 도움말에서 확인 · 앱 버전에 따라 화면이 조금 다를 수 있어요
개발자용: 터미널 명령과 JSON 설정
컴퓨터에 설치
Claude Code
claude mcp add --scope user horizun-msproject -- dnx HorizunMsProjectMcp --yesClaude Desktop (claude_desktop_config.json)
{
"mcpServers": {
"horizun-msproject": {
"command": "dnx",
"args": [
"HorizunMsProjectMcp",
"--yes"
]
}
}
}Cursor (~/.cursor/mcp.json)
{
"mcpServers": {
"horizun-msproject": {
"command": "dnx",
"args": [
"HorizunMsProjectMcp",
"--yes"
]
}
}
}VS Code (mcp.json)
{
"servers": {
"horizun-msproject": {
"type": "stdio",
"command": "dnx",
"args": [
"HorizunMsProjectMcp",
"--yes"
]
}
}
}이 설정은 제작자의 레지스트리 정보로 만들었어요. README와 다르면 README를 따르세요.
한눈에 보기
- 주간 다운로드i
- npm/PyPI에 없음
- 연결 방식
- 내 컴퓨터에서 실행
- 최신 버전i
- 1.6.1
- 레지스트리 공개i
- 2026년 10월 20일
- 코드 마지막 변경i
- 2026년 11월 17일
- 제작자
- HorizunGroup
- 패키지
nuget: HorizunMsProjectMcp- 웹사이트
- github.com
- 레지스트리 상태
- 활성
어떤 앱에서 쓸 수 있나요
이 서버의 연결 방식과 각 앱의 공식 문서를 바탕으로 했어요. 2026년 11월 10일 확인.
내 컴퓨터에서 실행하는 앱
ClaudeGooseLM StudioMsty StudioCherry StudioCursorVS Code + GitHub CopilotVisual StudioWindsurf (Devin Desktop)ZedKiroClineContinueJetBrains AI AssistantClaude CodeCodex CLIGemini CLIOpenCodenodecodeWarpLibreChatRaycast
할 수 있는 일
내 컴퓨터에서 실행돼요. 설치하면 AI 앱에 도구 목록이 나타나요.
기본 점검i
누구나 볼 수 있는 정보를 점검했고, 코드는 읽지 않았어요. 해당하지 않는 항목은 개수에서 뺐어요. · 2026년 11월 20일 점검
- ✓ 통과
제작자와 저장소 일치
레지스트리 이름이 GitHub 계정 HorizunGroup 기준으로 확인되었고, 이 계정이 저장소를 소유하고 있어요
- ✓ 통과
계속 관리되고 있음
코드 마지막 변경: 3일 전
- ✓ 통과
라이선스 있음
MIT 사용
- – 해당 없음
엔드포인트 응답
내 컴퓨터에서 실행되는 서버라 인터넷 엔드포인트가 없어요
- – 해당 없음
OAuth로 로그인
내 컴퓨터에서 실행되며, 대신 로컬 설정을 사용해요
- … 아직 점검 안 함
도구 설명에 숨겨진 지시 없음
내 컴퓨터에서 실행돼요. 도구 목록은 인터넷 엔드포인트가 있는 서버에서만 읽을 수 있어요
제작자: 재확인 요청 또는 잘못된 정보 신고
제작자용: README에 배지 달기
제작자라면 이 코드를 README에 붙여 넣으세요. 배지는 이 페이지로 연결됩니다.
[](https://mcp.popnx.com/en/servers/horizungroup-horizun-msproject-mcp)토론
질문하고, 팁을 나누고, 안 되는 점을 알려 주세요. "도움이 됨"이 많은 순서예요.
사용자 리뷰
아직 리뷰가 없어요
개발자 도구 카테고리의 다른 서버와 비교i
- 이 카테고리의 다른 서버 6202개 중 89%보다 스타가 많아요
- 이 카테고리의 다른 서버 6202개 중 51%보다 최근에 레지스트리에 공개됐어요
- 기본 점검 결과가 이 카테고리의 다른 서버 6202개 중 99%와 같거나 더 좋아요
레지스트리에서 이 카테고리의 활성 서버 전체와 비교했어요. 스타는 게시자가 저장소를 소유한 경우에만 세요.
자주 묻는 질문
Microsoft Project, 안전한가요?
해당하는 기본 점검 3개 중 3개를 통과했어요. 코드는 읽지 않았어요. 키나 토큰을 넣기 전에 서버가 어떤 권한을 요구하는지 확인하고, 꼭 필요한 권한만 있는 키를 쓰세요.
어떤 키나 코드가 필요한가요?
레지스트리에 필수 키가 나와 있지 않아요. 다만 처음 쓸 때 로그인을 요구하는 서버도 있어요.
내 컴퓨터에서 실행되나요, 클라우드에서 실행되나요?
내 컴퓨터에서 실행돼요. AI 앱이 필요할 때 실행하고, 데이터는 제작자의 서버를 거치지 않아요(서버 자체가 온라인 서비스를 호출하는 경우는 제외).
아직 관리되고 있나요?
GitHub 저장소는 마지막으로 3일 전 변경됐고, 최신 버전(1.6.1)은 31일 전 레지스트리에 올라왔어요.
어떤 앱에서 쓸 수 있나요?
Claude Desktop, Claude Code, Cursor, VS Code처럼 MCP를 지원하는 앱에서 쓸 수 있어요. 내 컴퓨터에 .NET도 있어야 해요.
대신 쓸 수 있는 건 뭐가 있나요?
같은 카테고리에는: GitDiagram, Appllama, Cloudflare MCP, Omnara, Repowise
비슷하게 동작하는 다른 것
같은 카테고리, 다른 제작자, 명령 확인 완료. 공식이 먼저, 그다음 스타 순.
카드 보는 법:↓ 주간 다운로드i★ GitHub 스타i세 기둥: 리뷰 · 점검 · 사용 정도i업데이트 = 최신 버전을 레지스트리에 공개한 날i
GitDiagram
Architecture diagrams, explanations and Mermaid source for public GitHub repositories.
Appllama
Study screens, flows and paywalls from top-earning iOS apps, then build from what wins.
Omnara
Deploy durable AI agents with Omnara, an open-source managed-agent platform.
Repowise
Codebase intelligence for AI coding agents: graph, git history, docs, decisions, code health.
| 이 항목 Microsoft Project | GitDiagram | Appllama | Cloudflare MCP | Omnara | Repowise | |
|---|---|---|---|---|---|---|
| 실행 위치 | 컴퓨터에 설치 필요 | 클라우드에서 동작, 설치 불필요 | 클라우드에서 동작, 설치 불필요 | 클라우드에서 동작, 설치 불필요 | 클라우드에서 동작, 설치 불필요 | 클라우드 또는 컴퓨터 설치 모두 가능 |
| 키 필요 | 아니요 | 아니요 | 아니요 | 아니요 | 아니요 | 아니요 |
| Claude에서 +로 추가 | 아니요 | 아니요 | 아니요 | 예 | 아니요 | 아니요 |
| 기본 점검 | 3/3 | 4/4 | 4/4 | 4/4 | 4/4 | 5/5 |
| 라이선스 | MIT | MIT | MIT | Apache-2.0 | Apache-2.0 | AGPL-3.0 |
| 가격 | 등록 정보에 비용 없음 | 등록 정보에 비용 없음 | 등록 정보에 비용 없음 | 등록 정보에 비용 없음 | 등록 정보에 비용 없음 | 등록 정보에 비용 없음 |
제작자의 README
README 열기
제작자의 저장소에서 쓰인 그대로 가져왔어요. PopNx MCP가 검토하거나 보증한 내용이 아니에요. HTML, 이미지, 스크립트는 제거했어요. 링크를 누르면 이 사이트를 벗어나요.
Horizun Project MCP
An MCP server for Microsoft Project that needs neither Java nor Microsoft Project — and tells you the truth about what it wrote.
It works as a PMO, not as a software operator. It does not just click through Microsoft Project on your behalf: it plans, controls and reports the way a project management office does, following PMBOK — a WBS that obeys the 100% rule, a cost-loaded baseline, earned value and earned schedule, quantitative schedule risk, formal change control with reasons and approvers, weekly look-ahead planning with PPC, and a period status report with its trend. Project is the engine; the method is the product.
*Español*
Point any MCP client at a .mpp, a Primavera .xer, or an MSPDI .xml and ask real questions: where the critical path runs, which resources are overbooked, whether the schedule would survive a DCMA audit, what a two-week slip actually does to the finish date. Then write changes back — and know which ones landed, because every one is re-read from the model before it is reported.
dotnet tool install -g HorizunMsProjectMcp
That is the whole install. No JVM. No Microsoft Project. No licence. It reads and schedules on its own.
Connect a client
| Client | Do this |
|---|---|
| Claude Desktop | Download the .mcpb from Releases and drop it on Settings → Extensions. It installs the server itself — nothing to run first. |
| Claude Code | claude mcp add horizun-msproject-mcp -- horizun-msproject-mcp |
| Codex | codex mcp add horizun-msproject-mcp -- horizun-msproject-mcp |
| ChatGPT | Needs an HTTPS bridge in front of the stdio server. How, and what to weigh first. |
Full per-client instructions, including the plugin route and uninstall, are in docs/INSTALL.md.
Why this one
There are a handful of Microsoft Project MCP servers. Every one of them requires Java, or a licensed Microsoft Project install, or a paid JDBC driver — and on the machine this was built on, none of them would start. Eight things here are not available anywhere else:
| Zero prerequisites | A single .NET binary. MPXJ is compiled to .NET through IKVM, so there is no JVM anywhere in the picture, and no Microsoft Project either. |
| Microsoft Project's dates, not an imitation | Where Project is installed, Project itself calculates every date this server reports. On seven real schedules — 8,823 tasks — recalculations and edits made through it matched Project on every task, to the minute. How. |
| Verified writes | Microsoft Project silently ignores writes all the time — auto-scheduled dates, hard constraints, summary rollups, calculated costs. Nothing here is reported as applied until it has been read back out of the model and matched. |
| DCMA 14-point assessment | The industry standard for judging whether a schedule can be run on. The Primavera servers implement it; none of the Microsoft Project ones do. Check 12 genuinely injects a 600-day delay and measures what moves. |
| It recovers logic nobody linked | A schedule laid out correctly on the bar chart but never linked is the most common defect there is: DCMA flags it, nothing fixes it. The dates already state the order — this reads it back out, verifies the same order holds across every repetition, and proposes the missing links. |
| Reprogramming that is measured | Recovery options are applied to a copy of the schedule, rescheduled, and reported with the finish date they actually produce. An option that recovers nothing says so instead of being offered as advice. |
| It learns from your past projects | Point it at finished schedules and it reports what each activity really took and what usually precedes it, then drafts a new programme from that — one task per unit, sequenced the way the trades actually followed each other. |
| A BIM bridge | Tie schedule tasks to model elements by code, turn measured quantities into duration proposals, and emit the per-element dates that drive 4D in Navisworks and the progress dashboard in Power BI. Nobody else does this at all. |
The 27 tools
Session — project_health · project_open · project_save
project_health is a doctor, not a ping. It detects Microsoft Project, tests whether its COM server *actually starts*, and when it does not, hands back the HRESULT diagnosis and the repair steps. That is not hypothetical: this machine hit CO_E_SERVER_EXEC_FAILURE with a perfectly valid registration, and step one of the repair path it emits is what fixed it.
Reading — project_info · tasks_query · links_query · resources_query · timephased_query
Filtered, paged, field-selectable. Tasks are addressed by their stable uid; the row id is display only, because it shifts the moment a task is inserted and addressing by it edits the wrong task.
Analysis — schedule_analyze · schedule_qa · baseline_compare
Computed server-side, so the agent asks a question instead of pulling two thousand tasks into context. Critical path, float distribution, driving path, day-by-day overallocation, DCMA-14, and full earned value (BCWS/BCWP/ACWP, SPI, CPI, EAC, TCPI) — denominated in cost where the schedule carries costs, in work hours where it carries hours, and weighted by duration where it carries neither, which is most of them. The report says which.
Writing — tasks_write · links_write · resources_write · calendars_write · schedule_update
Batched, typed, verified. Cycles are refused before they are applied, with the offending chain named. Calendars are edited in full: the working week and its hours (half or full Saturdays, shifts), working and non-working exceptions with their hours, the project calendar, and task and resource calendars. Tasks take their type, effort-driven flag, fixed cost, a baseline cost that leaves the baseline dates alone, and a whole outline in one batch; resources take rates, overtime rates, material units and max units Project actually sees. schedule_update op level_resources levels with Microsoft Project's own leveller, optionally within slack only. One thing is not offered: moving a task to another position in the outline. Asking for it gets a refusal that names it — an operation that half-works is worse than one that is absent.
Planning — schedule_recovery · schedule_scenarios · schedule_target · schedule_sequence · schedule_learn · schedule_generate
Reprogramming, measured rather than asserted. schedule_recovery finds what is late, ranks it by how much of the schedule sits behind it, then tries each recovery lever — removing lag on the driving chain, overlapping hand-offs once half the predecessor is done, compressing the longest critical tasks, working full Saturdays, and all of them together — on a throwaway copy and reports the finish date each one genuinely produces, and why any lever was dropped. schedule_scenarios compares alternatives you define — calendar, resource, task and logic changes together — side by side: finish, cost, overallocation, critical tasks, nothing committed. schedule_target tests a date you have been handed and names the work the network does not hold in place. schedule_sequence recovers the logic a schedule is missing by reading the order its own dates already state — the planner laid the work out correctly and never linked it, and that decision is recoverable. schedule_learn mines finished schedules for how long each activity actually takes and what usually comes before it; schedule_generate turns that into a first draft, one task per apartment or floor, sequenced the way the history says the trades follow each other.
Feed schedule_learn a model export alongside the schedules and it measures productivity — what a crew actually got through in a day — by joining quantities to tasks on the shared code. schedule_generate then sizes durations from the quantities of the new project rather than copying a remembered duration, because the rate is what carries between projects and the quantity is what changes. Give one export per schedule, in the same order: rates are measured per project, and quantities totalled across projects would inflate every one of them.
A draft can only be as well sequenced as the schedules it learned from. Where the sources link each activity to itself unit after unit but never to the trades around it, both tools say so and name the number: the library reports how many activities learned a predecessor other than themselves, and the draft reports how many trades it left with nothing scheduled before them.
Project control — schedule_risk, plus PMO aspects of the tools above
- Quantitative schedule risk (
schedule_risk): Monte Carlo over the network's own logic, all four link types and lags, with three-point ranges per task or a default spread, counted in working hours of the project calendar (half Saturdays and elapsed lags included) and anchored on the schedule's own finish, so the most-likely run is the schedule. P10/P50/P80/P90 finish, probability of a target and of the baseline, P80 contingency, risk drivers by criticality and sensitivity. Seeded runs repeat exactly. - Period status report (
schedule_analyzeaspectstatus_report): planned vs earned, SPI, CPI, earned-schedule SPI(t), EAC by three methods, TCPI, forecast finish, milestones at risk, top issues, and the trend of every recorded cut-off. - Cost-loaded schedule (
schedule_updateopload_budget): a budget by code, the same code BIM links on, spread over the tasks as cost; lines no task carries are reported.timephased_querymeasures_curvereturns cumulative PV, EV and AC, in money when costs are loaded. - Integrated change control: a rebaseline needs a
reason(and takesapprovedBy); every baseline, budget load and committed edit batch is logged with its finish impact (aspectchange_log). - Short-interval planning (aspect
lookahead): the next weeks' work with each task's constraints, ready vs constrained, and PPC against last week's recorded commitment (Last Planner). - WBS discipline:
schedule_qachecks the 100% rule (empty summaries, cost or resources on summaries, duplicate WBS codes, single-child summaries);project_exportformatwbs_dictionarywrites the WBS dictionary.
The history (cut-offs, commitments, changes) lives beside the schedule in .hzpmo.json, so it survives whichever tool writes the .mpp next.
Interop — project_export · project_import · bim_link · bim_sync
CSV, JSON, MSPDI, Primavera XER and PMXML, native .mpp, and a shaped Power BI dataset. Imports plan before they write.
What it costs to have loaded
The 27 tools present about 13,500 tokens of schema, in every prompt, for as long as the server is connected. That is the honest price of the surface and it is worth knowing before choosing to carry it. It is also why the surface stays near 25: the largest alternative ships 79 tools, and past a point an agent cannot hold the surface in its head well enough to choose correctly within it.
The two contracts
Nothing is applied until it is verified.
{